Supply Chain Disruptions
6/16/2024
Some products continue to have extended lead times while others have improved. Our suppliers’ shipments could fluctuate and larger orders may require additional time for fulfillment. If you have questions about your orders or lead times, please contact our Customer Service Team at [email protected] or 800-328-2724.
Updated Lead Times - See Chart Below
NOTE: Lead times below are averages of all parts carried for that manufacturer. To see the lead time for a single part, look up the part on the Waytek website—each part includes future availability and lead time info.
- No Impact = standard lead time still applies
- Minimal Delays = No change over last 60 days and still delayed over standard lead time.
- Minimal Impact (green arrow) = 1-2 weeks of additional lead time over standard. *Reduced lead times over the last 60 days
- Minimal Impact (yellow arrow) = 1-2 weeks of additional lead time over standard, no changes over the last 60 days
- Moderate Impact (orange arrow) = 3-5 weeks of additional lead time over standard,
*Please note that standard lead times are averages of all parts carried for that manufacturer. Lead times for some components are longer than the average listed.
Supplier
Standard Lead Times*
Current Status (Additional Lead Time)
Impacted Products
3M
Minimal delays (add. 1-2 weeks)
8-10 weeks
Heat Shrink Solderless Terminals
ACT
Minimal delays (add. 1-2 weeks)
8-10 weeks
Standard Cable Ties
AFC Cable Systems
Minimal delays (add. 1-2 weeks)
8-10 weeks
Conduit
Amphenol
Minimal delays (add. 1-2 weeks)
14-16 weeks
A Series Connectors
Anderson Power
Minimal delays
6-8 weeks
SB Connectors
Aptiv (Formerly Delphi)
Moderate delays (add. 3-5 weeks)
14-16 weeks
Multi-pin Connectors & Terminal Reels
Blue Sea Systems
Minimal delays (add. 1-2 weeks)
14-16 weeks
Fuse Blocks
CIT Relay & Switch
Minimal delays
8-10 weeks
Mini ISO Relays
Carling Technologies
Minimal delays
8-10 weeks
Rocker Switches
Casco
Minimal delays (add. 1-2 weeks)
8-10 weeks
Champlain Cable
Minimal delays (add. 1-2 weeks)
10-12 weeks
Can-bus Cable
Cole Hersee - A Littelfuse Brand
Minimal delays
8-10 weeks
Switching Devices
DSG Canusa
Minimal delays
8-10 weeks
Heat Shrink
Data Panel Corp
Minimal delays (add. 1-2 weeks)
10-12 weeks
Disconneccts
Delfingen
Minimal delays (add. 1-2 weeks)
10-12 weeks
Wire Covering
Deutsch
Minimal delays (add. 1-2 weeks)
10-12 weeks
Crimpers
Durham Manufacturing
No Impact
6-8 weeks
Dynatex
No Impact
6-8 weeks
East Penn Manufacturing
Minimal delays
12-14 weeks
Wire & Cable
Eaton
Moderate delays (add. 3-5 weeks)
14-16 weeks
Circuit Breakers & Power Distribution Modules
Eclipse Tools
No Impact
6-8 weeks
Egis Mobile Electric
Minimal delays
8-10 weeks
Fuse Blocks
Essentra Plastics
Minimal delays
8-10 weeks
Clips & Clamps
GEP Power Products
Minimal delays
8-10 weeks
Power Distribution Modules
GIGAVAC
Moderate delays (add. 3-5 weeks)
14-16 weeks
Contactors
General Cable
Minimal delays (add. 1-2 weeks)
12-14 weeks
Wire & Cable
Grote
Minimal delays (add. 1-2 weeks)
8-10 weeks
Lights
HELLA
Moderate delays (add. 3-5 weeks)
12-14 weeks
Mini ISO Relays
HMI Systems
No Impact
8-10 weeks
HellermannTyton
Minimal delays (add. 1-2 weeks)
10-12 weeks
Standard Cable Ties
Heyco
No Impact
8-10 weeks
Ideal Industries
No Impact
8-10 weeks
Ideal Tridon
No Impact
8-10 weeks
InPower
No Impact
8-10 weeks
Klein Tools
No Impact
6-8 weeks
Supplier
Standard Lead Times*
Current Status (Additional Lead Time)
Impacted Products
Leviton
Minimal delays
8-10 weeks
Switching Devices
Littelfuse
Minimal delays (add. 1-2 weeks)
12-14 weeks
Fuse & Fuse Holder
Lovato Electric Inc
Minimal delays
8-10 weeks
Switching Devices
MTA
No Impact
8-10 weeks
Marinco
Minimal delays
8-10 weeks
Battery Management Devices
Master Appliance
No Impact
8-10 weeks
Mastervolt
Minimal delays (add. 1-2 weeks)
10-12 weeks
Battery Management Devices
Maxxima
Minimal delays
10-12 weeks
Lights
Mechanical Products
Minimal delays (add. 1-2 weeks)
8-10 weeks
Circuit Breakers
Molex
Moderate delays (add. 3-5 weeks)
12-14 weeks
Solderless Terminals
NOCO Company
No Impact
8-10 weeks
Nason
Minimal delays
10-12 weeks
Switching Devices
OptiFuse
Minimal delays (add. 1-2 weeks)
12-14 weeks
Circuit Breakers
Picker Components
Minimal delays
10-12 weeks
Mini ISO Relays
Pollak
Minimal delays
8-10 weeks
Switching Devices
Pressmaster
Minimal delays
12-14 weeks
Crimpers
ProMariner
Minimal delays (add. 1-2 weeks)
8-10 weeks
Battery Management Devices
Rennsteig Tools
Minimal delays (add. 1-2 weeks)
8-10 weeks
Crimpers
Rowe Electronics
No Impact
8-10 weeks
Safco
No Impact
6-8 weeks
Sargent Tools Oetiker
No Impact
8-10 weeks
Scapa
No Impact
8-10 weeks
Sealcon
No Impact
8-10 weeks
Song Chuan
Minimal delays (add. 1-2 weeks)
22-26 weeks
Mini ISO Relays
Southwire
Moderate delays
14-16 weeks
Wire & Cable
TE - Raychem
Moderate delays
14-16 weeks
Wire Covering
TE Connectivity
Minimal delays
12-14 weeks
Multi-pin Connectors
Techflex
Minimal delays (add. 1-2 weeks)
8-10 weeks
Wire Covering
tesa
Minimal delays
8-10 weeks
Tape
Thomas & Betts
No Impact
8-10 weeks
Cable Ties
Trombetta
Minimal delays (add. 1-2 weeks)
12-14 weeks
Contactors
UMPCO Inc.
Minimal delays
8-10 weeks
Clamps
Unity Manufacturing
No Impact
8-10 weeks
White-Rodgers Emerson
Minimal delays (add. 1-2 weeks)
12-14 weeks
Contactors
Yazaki
Minimal delays (add. 1-2 weeks)
12-14 weeks
Multi-pin Connectors
4/5/2024
Some products continue to have extended lead times while others have improved. Our suppliers’ shipments could fluctuate and larger orders may require additional time for fulfillment. If you have questions about your orders or lead times, please contact our Customer Service Team at [email protected] or 800-328-2724.
Updated Lead Times - See Chart Below
NOTE: Lead times below are averages of all parts carried for that manufacturer. To see the lead time for a single part, look up the part on the Waytek website—each part includes future availability and lead time info.
- No Impact = standard lead time still applies
- Minimal Impact (green) = 1-2 weeks of additional lead time over standard. *Reduced lead times over the last 60 days
- Minimal Impact (yellow) = 1-2 weeks of additional lead time over standard, no changes over the last 60 days
- Moderate Impact (orange) = 3-5 weeks of additional lead time over standard,
- Major Impact (red)= Unknown, at least double the standard lead time
*Please note that standard lead times are averages of all parts carried for that manufacturer. Lead times for some components are longer than the average listed.
Supplier
Standard Lead Times*
Current Status (Additional Lead Time)
Impacted Product Offerings
3M
Minimal Delays (add. 1-2 weeks)
8 Weeks ↑
Heat Shrink Solderless Terminals
ACT
Minimal delays (add. 1-2 weeks)
8-10 weeks
Standard Cable Ties
AFC Cable Systems
Minimal delays (add. 1-2 weeks)
8-10 weeks
Conduit
Amphenol Sine Systems
Minimal Delays (add. 1-2 Weeks)
8 Weeks
A Series Connectors
Anderson Power
Minimal delays (add. 1-2 weeks)
6 Weeks
SB Connectors
Aptiv (Formerly Delphi)
Moderate delays (add. 3-5 weeks)
16 Weeks
Multi-pin Connectors & Terminal Reels
Bayco
No impact
6 Weeks
Blue Sea Systems
Minimal delays (add. 1-2 weeks)
14 Weeks
Fuse Blocks
CIT Relay & Switch
Minimal Delays
10 Weeks
Mini ISO Relays
Carling Technologies
Minimal delays (add. 1-2 weeks)
10 Weeks
Rocker Switches
Casco
No impact
8 Weeks
Champlain Cable
Minimal delays (add. 1-2 weeks)
12 Weeks
Can-bus Cable
Cole Hersee-A Littelfuse Brand
Minimal delays (add. 1-2 weeks)
10 Weeks
Switching Devices
DSG Canusa - Shawcor
Minimal delays (add. 1-2 weeks)
10 Weeks
Heat Shrink
Data Panel Corp
Minimal delays (add. 1-2 weeks)
12 Weeks
Disconneccts
Delfingen
Minimal delays (add. 1-2 weeks)
12 Weeks
Wire Covering
Deutsch
Minimal delays (add. 1-2 weeks)
12 Weeks
Crimpers
Durham Manufacturing
No impact
6 Weeks
Dynatex
No impact
6 Weeks
East Penn Manufacturing
Minimal delays (add. 1-2 weeks)
12 Weeks
Wire & Cable
Eaton
Moderate delays (add. 3-5 weeks)
16 Weeks
Circuit Breakers & Power Distribution Modules
Eclipse Tools
No impact
6 Weeks
Egis Mobile Electric
Minimal delays (add. 1-2 Weeks)
8 Weeks
Fuse Blocks
Essentra Plastics
Minimal delays (add. 1-2 weeks)
10 Weeks
Clips & Clamps
GEP Power Products
Minimal delays (add. 1-2 weeks)
8 Weeks
Power Distribution Modules
GIGAVAC
Moderate delays (add. 3-5 weeks)
14 Weeks
Contactors
General Cable
Minimal delays (add. 1-2 weeks)
14 Weeks
Wire & Cable
Grote
Minimal delays (add. 1-2 weeks)
10 Weeks
Lights
HELLA
Moderate delays (add. 3-5 weeks)
14 Weeks
Mini ISO Relays
HMI Systems
No impact
8 Weeks
HellermannTyton
Minimal delays (add. 1-2 weeks)
12 Weeks
Standard Cable Ties
Heyco
No impact
8 Weeks
Ideal Industries
No impact
8 Weeks
Ideal Tridon
No impact
8 Weeks
InPower
No impact
8 Weeks
Klein Tools
No impact
6 Weeks
Supplier
Standard Lead Times*
Current Status (Additional Lead Time)
Impacted Product Offerings
Leviton
Minimal delays (add. 1-2 weeks)
8 Weeks
Switching Devices
Littelfuse
Minimal delays (add. 1-2 Weeks)
14 Weeks
Fuse & Fuse Holder
Lovato Electric Inc
Minimal delays (add. 1-2 weeks)
8 Weeks
Switching Devices
MTA
No impact
10 Weeks
Marinco
Minimal delays (add. 1-2 weeks)
8 Weeks
Battery Management Devices
Master Appliance
No impact
8 Weeks
Mastervolt
Minimal delays (add. 1-2 weeks)
12 Weeks
Battery Management Devices
Maxxima
Minimal delays (add. 1-2 weeks)
10 Weeks
Lights
Mechanical Products
Minimal delays (add. 1-2 weeks)
10 Weeks
Circuit Breakers
Molex
Moderate delays (add. 3-5 weeks)
14 Weeks
Solderless Terminals
NOCO Company
No impact
8 Weeks
Nason
Minimal delays (add. 1-2 weeks)
10 Weeks
Switching Devices
OptiFuse
Minimal delays (add. 1-2 weeks)
14 Weeks
Circuit Breakers
Picker Components
Minimal delays (add. 1-2 weeks)
10 Weeks
Mini ISO Relays
Pollak
Minimal delays (add. 1-2 weeks)
8 Weeks
Switching Devices
Pressmaster
Minimal delays (add. 1-2 weeks)
12 Weeks
Crimpers
ProMariner
Minimal delays (add. 1-2 weeks)
8 Weeks
Battery Management Devices
Rennsteig Tools
Minimal delays (add. 1-2 weeks)
12 Weeks
Crimpers
Rowe Electronics
No impact
8 Weeks
Safco
No impact
6 Weeks
Sargent Tools Oetiker
No impact
8 Weeks
Scapa
No impact
8 Weeks
Sealcon
No impact
8 Weeks
Song Chuan
Minimal delays (add. 1-2 Weeks)
26 Weeks
Mini ISO Relays
Southwire
Moderate delays (add. 3-5 weeks)
16 Weeks
Wire & Cable
TE - Raychem
Moderate delays (add. 3-5 weeks)
16 Weeks
Wire Covering
TE Connectivity
Minimal delays (add. 1-2 weeks)
12 Weeks
Multi-pin Connectors
Techflex
Minimal delays (add. 1-2 Weeks)
10 Weeks
Wire Covering
Tesa Tape
Minimal delays (add. 1-2 weeks)
8 Weeks
Tape
Thomas & Betts
No impact
10 Weeks
Cable Ties
Trombetta
Minimal delays (add. 1-2 weeks)
14 Weeks
Contactors
UMPCO Inc.
Minimal delays (add. 1-2 weeks)
8 Weeks
Clamps
Unity Manufacturing
No impact
8 Weeks
White-Rodgers Emerson
Minimal delays (add. 1-2 weeks)
14 Weeks
Contactors
Yazaki
Minimal delays (add. 1-2 weeks)
14 Weeks
Multi-pin Connectors
9/12/2023
Some products continue to have extended lead times while others have improved. Our suppliers’ shipments could fluctuate and larger orders may require additional time for fulfillment. If you have questions about your orders or lead times, please contact our Customer Service Team at [email protected] or 800-328-2724.
Updated Lead Times - See Chart Below
NOTE: Lead times below are averages of all parts carried for that manufacturer. To see the lead time for a single part, look up the part on the Waytek website—each part includes future availability and lead time info.
- No Impact = standard lead time still applies
- Minimal Impact (green) = 1-2 weeks of additional lead time over standard. *Reduced lead times over the last 60 days
- Minimal Impact (yellow) = 1-2 weeks of additional lead time over standard, no changes over the last 60 days
- Moderate Impact (orange) = 3-5 weeks of additional lead time over standard,
- Major Impact (red)= Unknown, at least double the standard lead time
*Please note that standard lead times are averages of all parts carried for that manufacturer. Lead times for some components are longer than the average listed.
Supplier
Standard Lead Time*
Current Status (Additional Lead Time)
Impacted Product Offerings
3M
8 weeks
Minimal delays (add. 1-2 weeks)
Heat Shrink Solderless Terminals
ACT
8 weeks
Minimal delays (add. 1-2 weeks)
Standard Cable Ties
AFC Cable Systems
8 weeks
Minimal delays (add. 1-2 weeks)
Conduit
Amphenol Sine Systems
14 weeks
Minimal delays (add. 1-2 weeks)
A Series Connectors
Anderson Power
6 Weeks |
Minimal delays (add. 1-2 weeks)
SB Connectors
Aptiv (Formerly Delphi)
16 Weeks
Moderate delays (add. 3-5 weeks)
Multi-pin Connectors & Terminal Reels
Bayco
6 Weeks
No impact
Blue Sea Systems
14 Weeks
Moderate delays (add. 3-5 weeks)
Fuse Blocks
CIT Relay & Switch
10 Weeks
Minimal delays (add. 1-2 weeks)
Mini ISO Relays
Carling Technologies
12 Weeks
Minimal delays (add. 1-2 weeks)
Rocker Switches
Casco
8 Weeks
No impact
Champlain Cable
12 Weeks
Minimal delays (add. 1-2 weeks)
Can-bus Cable
Cole Hersee-A Littelfuse Brand
10 Weeks
Minimal delays (add. 1-2 weeks)
Switching Devices
DSG Canusa - Shawcor
10 Weeks
Minimal delays (add. 1-2 weeks)
Heat Shrink
Data Panel Corp
10 Weeks
Minimal delays (add. 1-2 weeks)
Delfingen
12 Weeks
Minimal delays (add. 1-2 weeks)
Wire Covering
Deutsch
12 Weeks
Minimal delays (add. 1-2 weeks)
Crimpers
Durham Manufacturing
6 Weeks
No impact
Dynatex
6 Weeks
No impact
East Penn Manufacturing
12 Weeks
Minimal delays (add. 1-2 weeks)
Wire & Cable
Eaton
18 Weeks
Moderate delays (add. 3-5 weeks)
Circuit Breakers & Power Distribution Modules
Eclipse Tools
6 Weeks
No impact
Egis Mobile Electric
8 Weeks
Minimal delays (add. 1-2 weeks)
Fuse Blocks
Essentra Plastics
10 Weeks
Minimal delays (add. 1-2 weeks)
Clips & Clamps
GEP Power Products
8 Weeks
Minimal delays (add. 1-2 weeks)
Power Distribution Modules
GIGAVAC
14 Weeks
Moderate delays (add. 3-5 weeks)
Contactors
General Cable
14 Weeks
Minimal delays (add. 1-2 weeks)
Wire & Cable
Grote
10 Weeks
Minimal delays (add. 1-2 weeks)
Lights
HELLA
14 Weeks
Moderate delays (add. 3-5 weeks)
Mini ISO Relays
HMI Systems
8 Weeks
No impact
HellermannTyton
12 Weeks
Minimal delays (add. 1-2 weeks)
Standard Cable Ties
Heyco
8 Weeks
No impact
Ideal Industries
8 Weeks
No impact
Ideal Tridon
8 Weeks
No impact
InPower
8 Weeks
No impact
Klein Tools
6 Weeks
No impact
Supplier
Standard Lead Time*
Current Status (Additional Lead Time)
Impacted Product Offerings
Leviton
8 Weeks
Minimal delays (add. 1-2 weeks)
Switching Devices
Littelfuse
14 Weeks
Minimal delays (add. 1-2 weeks)
Fuse & Fuse Holder
Lovato Electric Inc
8 Weeks
Minimal delays (add. 1-2 weeks)
Switching Devices
MTA
10 Weeks
No impact
Marinco
8 Weeks
Minimal delays (add. 1-2 weeks)
Battery Management Devices
Master Appliance
8 Weeks
No impact
Mastervolt
12 Weeks
Minimal delays (add. 1-2 weeks)
Battery Management Devices
Maxxima
10 Weeks
Minimal delays (add. 1-2 weeks)
Lights
Mechanical Products
10 Weeks
Minimal delays (add. 1-2 weeks)
Circuit Breakers
Molex
14 Weeks
Moderate delays (add. 3-5 weeks)
Solderless Terminals
NOCO Company
8 Weeks
No impact
Nason
10 Weeks
Minimal delays (add. 1-2 weeks)
Switching Devices
OptiFuse
14 Weeks
Minimal delays (add. 1-2 weeks)
Circuit Breakers
Picker Components
10 Weeks
Minimal delays (add. 1-2 weeks)
Mini ISO Relays
Pollak
8 Weeks
Minimal delays (add. 1-2 weeks)
Switching Devices
Pressmaster
12 Weeks
Minimal delays (add. 1-2 weeks)
Crimpers
ProMariner
8 Weeks
Minimal delays (add. 1-2 weeks)
Battery Management Devices
Rennsteig Tools
12 Weeks
Minimal delays (add. 1-2 weeks)
Crimpers
Rowe Electronics
8 Weeks
No impact
Safco
6 Weeks
No impact
Sargent Tools Oetiker
8 Weeks
No impact
Scapa
8 Weeks
No impact
Sealcon
8 Weeks
No impact
Song Chuan
26 Weeks
Minimal delays (add. 1-2 weeks)
Mini ISO Relays
Southwire
16 Weeks
Moderate delays (add. 3-5 weeks)
Wire & Cable
TE - Raychem
16 Weeks
Moderate delays (add. 3-5 weeks)
Wire Covering
TE Connectivity
12 Weeks
Minimal delays (add. 1-2 weeks)
Multi-pin Connectors
Techflex
10 Weeks
Minimal delays (add. 1-2 weeks)
Wire Covering
Tesa Tape
8 Weeks
Minimal delays (add. 1-2 weeks)
Tape
Thomas & Betts
10 Weeks
No impact
Cable Ties
Trombetta
14 Weeks
Minimal delays (add. 1-2 weeks)
Contactors
UMPCO Inc.
8 Weeks
Minimal delays (add. 1-2 weeks)
Clamps
Unity Manufacturing
8 Weeks
No impact
White-Rodgers Emerson
14 Weeks
Minimal delays (add. 1-2 weeks)
Contactors
Yazaki
14 Weeks
Minimal delays (add. 1-2 weeks)
Multi-pin Connectors
4/4/2023
Some products continue to have extended lead times while others have improved. Our suppliers’ shipments could fluctuate and larger orders may require additional time for fulfillment. If you have questions about your orders or lead times, please contact our Customer Service Team at [email protected] or 800-328-2724.
Updated Lead Times - See Chart Below
NOTE: Lead times below are averages of all parts carried for that manufacturer. To see the lead time for a single part, look up the part on the Waytek website—each part includes future availability and lead time info.
- No Impact = standard lead time still applies
- Minimal Impact (green) = 1-2 weeks of additional lead time over standard. *Reduced lead times over the last 60 days
- Minimal Impact (yellow) = 1-2 weeks of additional lead time over standard, no changes over the last 60 days
- Moderate Impact (orange) = 3-5 weeks of additional lead time over standard,
- Major Impact (red)= Unknown, at least double the standard lead time
*Please note that standard lead times are averages of all parts carried for that manufacturer. Lead times for some components are longer than the average listed.
Supplier
Standard Lead Time*
Current Status (Additional Lead Time)
Impacted Product Offerings
3M
8 weeks
Minimal delays (add. 1-2 weeks)
Solderless Terminals
ACT
6 weeks
Minimal delays (add. 1-2 weeks)
Standard Cable Ties
AFC Cable Systems
8 weeks
Minimal delays (add. 1-2 weeks)
Conduit
Amphenol Sine Systems
18 weeks
Minimal delays (add. 1-2 weeks)*
A series Connectors
Anderson Power
6 weeks
Minimal delays (add. 1-2 weeks)
SB Connectors
Aptiv (Formerly Delphi)
18 weeks
Moderate delays (add. 3-5 weeks)
Multi-pin Connectors & Terminal Reels
Bayco
6 Weeks
No impact
Blue Sea Systems
10 Weeks
Minimal delays (1-2 weeks)*
Battery Management
CIT Relay & Switch
14 Weeks
Minimal delays (1-2 weeks)*
Mini ISO Relays
Carling Technologies
14 Weeks
Minimal delays (add. 1-2 weeks)
Rocker Switches
Casco
8 weeks
No impact
Champlain Cable
10 weeks
Minimal delays (add. 1-2 weeks)
Can-bus Cable
Cole Hersee-A Littelfuse Brand
10 weeks
Minimal delays (add. 1-2 weeks)*
Switching Devices
DSG Canusa - Shawcor
10 weeks
Minimal delays (add. 1-2 weeks)
Heat Shrink
Data Panel Corp
10 weeks
Minimal delays (add. 1-2 weeks)
Delfingen
12 weeks
Minimal delays (add. 1-2 weeks)
Wire Covering
Deutsch
12 weeks
Minimal delays (add. 1-2 weeks)
Crimpers
Durham Manufacturing
6 weeks
No impact
Dynatex
6 weeks
No impact
East Penn Manufacturing
8 weeks
Minimal delays (add. 1-2 weeks)
Eaton
18 weeks
Moderate delays (add. 3-5 weeks)
Circuit Breakers & Power Distribution Modules
Eclipse Tools
6 weeks
No impact
Egis Mobile Electric
8 weeks
Minimal delays (add. 1-2 weeks)
Essentra Plastics
10 weeks
Minimal delays (add. 1-2 weeks)
Clips & Clamps
GEP Power Products
10 weeks
Minimal delays (add. 1-2 weeks)
Power Distribution Modules
GIGAVAC
14 weeks
Moderate delays (add. 3-5 weeks)
Contactors
General Cable
10 weeks
Minimal delays (add. 1-2 weeks)
Wire & Cable
Grote
10 weeks
Minimal delays (add. 1-2 weeks)
Lights
HELLA
14 weeks
Moderate delays (add. 3-5 weeks)
Mini ISO Relays
HMI Systems
8 weeks
No impact
HellermannTyton
10 weeks
Minimal delays (add. 1-2 weeks)
Standard Cable Ties
Heyco
8 weeks
No impact
Ideal Industries
8 weeks
No impact
Ideal Tridon
8 weeks
No impact
InPower
8 weeks
No impact
Klein Tools
6 weeks
No impact
Supplier
Standard Lead Time*
Current Status (Additional Lead Time)
Impacted Product Offerings
Leviton
8 weeks
Minimal delays (add. 1-2 weeks)
Switching Devices
Littelfuse
14 weeks
Minimal delays (1-2 weeks)*
Fuse & Fuse Holder
Lovato Electric Inc
8 weeks
Minimal delays (add. 1-2 weeks)
Switching Devices
MTA
10 weeks
No impact
Marinco
12 weeks
Minimal delays (add. 1-2 weeks)
Battery Management Devices
Master Appliance
8 weeks
No impact
Mastervolt
12 weeks
Minimal delays (add. 1-2 weeks)
Battery Management Devices
Maxxima
8 weeks
Minimal delays (add. 1-2 weeks)
Lights
Mechanical Products MP
12 weeks
Minimal delays (add. 1-2 weeks)
Circuit Breakers
Molex
18 weeks
Moderate delays (add. 3-5 weeks)
Solderless Terminals
NOCO Company
8 weeks
No impact
Nason
10 weeks
Minimal delays (add. 1-2 weeks)
Switching Devices
OptiFuse
14 weeks
Minimal delays (add. 1-2 weeks)
Circuit Breakers
Picker Components
14 weeks
Minimal delays (add. 1-2 weeks)
Mini ISO Relays
Pollak
12 weeks
Minimal delays (add. 1-2 weeks)
Switching Devices
Pressmaster
12 weeks
Minimal delays (add. 1-2 weeks)
Crimpers
ProMariner
10 weeks
Minimal delays (add. 1-2 weeks)
Battery Management Devices
Rennsteig Tools
12 weeks
Minimal delays (add. 1-2 weeks)
Crimpers
Rowe Electronics
8 weeks
No impact
Safco
6 weeks
No impact
Sargent Tools Oetiker
8 weeks
Minimal delays (add. 1-2 weeks)
Crimpers
Scapa
8 weeks
No impact
Sealcon
8 weeks
No impact
Song Chuan
26 weeks
Minimal delays (1-2 weeks)*
Mini ISO Relays
Southwire
12 weeks
Minimal delays (add. 1-2 weeks)
Wire & Cable
TE - Raychem
14 weeks
Moderate delays (add. 3-5 weeks)
Wire Covering
TE Connectivity
12 weeks
Moderate delays (add. 3-5 weeks)
Multi-pin Connectors
Techflex
10 weeks
Minimal delays (1-2 weeks)*
Wire Covering
Tesa Tape
8 weeks
Minimal delays (add. 1-2 weeks)
Tape
Thomas & Betts
10 weeks
No impact
Cable Ties
Trombetta
14 weeks
Moderate delays (add. 3-5 weeks)
Contactors
UMPCO Inc.
8 weeks
Minimal delays (add. 1-2 weeks)
Clamps
Unity Manufacturing
8 weeks
No impact
White-Rodgers Emerson
14 weeks
Minimal delays (add. 1-2 weeks)
Contactors
Yazaki
14 weeks
Minimal delays (add. 1-2 weeks)
Multi-pin Connectors
12/29/2022
Some products continue to have extended lead times while others have improved. Our suppliers’ shipments could fluctuate and larger orders may require additional time for fulfillment. If you have questions about your orders or lead times, please contact our Customer Service Team at [email protected] or 800-328-2724.
Updated Lead Times - See Chart Below
NOTE: Lead times below are averages of all parts carried for that manufacturer. To see the lead time for a single part, look up the part on the Waytek website—each part includes future availability and lead time info.
- No Impact = standard lead time still applies
- Minimal Impact = 1-2 weeks of additional lead time over standard
- Moderate Impact = 3-5 weeks of additional lead time over standard
- Major Impact = Unknown, at least double the standard lead time
*Please note that standard lead times are averages of all parts carried for that manufacturer. Lead times for some components are longer than the average listed.
Supplier
Standard Lead Time*
Current Status (Additional Lead Time)
Impacted Product Offerings
3M
8 weeks
Minimal delays (add. 1-2 weeks)
Solderless Terminals
ACT
4 weeks
Minimal delays (add. 1-2 weeks)
Standard Cable Ties
AFC Cable Systems
8 weeks
Minimal delays (add. 1-2 weeks)
Conduit
Amphenol Sine Systems
16 weeks
Minimal delays (add. 1-2 weeks)
A Series Connectors
Anderson Power
6 weeks
Minimal delays (add. 1-2 weeks)
SB Connectors
Aptiv (Formerly Delphi)
18 weeks
Moderate delays (add. 3-5 weeks)
Multi-Pin Connectors & Terminal Reels
Bayco
6 weeks
No impact
Blue Sea Systems
10 weeks
Minimal delays (add. 1-2 weeks)
Battery Management
CIT Relay & Switch
18 weeks
Minimal delays (add. 1-2 weeks)
Mini ISO Relays
Carling Technologies
12 Weeks
Minimal delays (add. 1-2 weeks)
Rocker Switches
Casco
8 weeks
No impact
Champlain Cable
10 weeks
No impact
Cole Hersee-A Littelfuse Brand
10 weeks
Minimal delays (add. 1-2 weeks)
Switching Devices
DSG Canusa - Shawcor
10 weeks
Moderate delays (add. 3-5 weeks)
Heat Shrink
Data Panel Corp
8 Weeks
No impact
Delfingen
12 Weeks
Minimal delays (add. 1-2 weeks)
Wire Covering
Deutsch
12 Weeks
Minimal delays (add. 1-2 weeks)
Crimpers
Durham Manufacturing
6 Weeks
No impact
Dynatex
6 Weeks
No impact
East Penn Manufacturing
8 Weeks
Minimal delays (add. 1-2 weeks)
Eaton
18 Weeks
Moderate delays (add. 3-5 weeks)
Circuit Breakers & Power Distribution Modules
Eclipse Tools
4 weeks
No impact
Egis Mobile Electric
4 weeks
No impact
Essentra Plastics
6 weeks
Minimal delays (add. 1-2 weeks)
Clips & Clamps
GEP Power Products
10 Weeks
Minimal delays (add. 1-2 weeks)
Power Distribution Modules
GIGAVAC
14 weeks
Minimal delays (add. 1-2 weeks)
Contactors
General Cable
10 Weeks
Minimal delays (add. 1-2 weeks)
Wire & Cable
Grote
10 Weeks
Minimal delays (add. 1-2 weeks)
Lights
HELLA
10 weeks
No impact
HMI Systems
8 weeks
No impact
HellermannTyton
10 weeks
Moderate delays (add. 3-5 weeks)
Standard Cable Ties
Heyco
8 weeks
No impact
Ideal Industries
10 Weeks
No impact
Ideal Tridon
10 Weeks
No impact
InPower
8 Weeks
Minimal delays (add. 1-2 weeks)
Contactors
Klein Tools
6 Weeks
No impact
Supplier
Standard Lead Time*
Current Status (Additional Lead Time)
Impacted Product Offerings
Leviton
8 weeks
Minimal delays (add. 1-2 weeks)
Switching Devices
Littelfuse
12 weeks
Minimal delays (add. 1-2 weeks)
Fuse & Fuse Holder
Lovato Electric Inc
8 weeks
Minimal delays (add. 1-2 weeks)
Switching Devices
MTA
10 weeks
No impact
Marinco
12 weeks
No impact
Master Appliance
8 weeks
No impact
Mastervolt
12 weeks
Minimal delays (add. 1-2 weeks)
Battery Management Devices
Maxxima
6 weeks
No impact
Mechanical Products MP
10 weeks
Minimal delays (add. 1-2 weeks)
Circuit Breakers
Molex
16 weeks
Moderate delays (add. 3-5 weeks)
Solderless Terminals
NOCO Company
8 weeks
No impact
Nason
8 weeks
Minimal delays (add. 1-2 weeks)
Switching Devices
OptiFuse
14 weeks
Minimal delays (add. 1-2 weeks)
Circuit Breakers
Picker Components
12 weeks
Minimal delays (add. 1-2 weeks)
Mini ISO Relays
Pollak
8 weeks
Minimal delays (add. 1-2 weeks)
Switching Devices
Pressmaster
12 weeks
Minimal delays (add. 1-2 weeks)
Crimpers
ProMariner
10 weeks
No impact
Rennsteig Tools
12 weeks
Minimal delays (add. 1-2 weeks)
Crimpers
Rowe Electronics
8 weeks
No impact
Safco
6 weeks
No impact
Sargent Tools Oetiker
8 weeks
Minimal delays (add. 1-2 weeks)
Crimpers
Scapa
6 weeks
No impact
Sealcon
8 weeks
No impact
Song Chuan
26 weeks
Minimal delays (add. 1-2 weeks)
Mini ISO Relays
Southwire
10 weeks
Minimal delays (add. 1-2 weeks)
Wire & Cable
TE - Raychem
14 weeks
Moderate delays (add. 3-5 weeks)
Wire Covering
TE Connectivity
10 weeks
Moderate delays (add. 3-5 weeks)
Multi-pin Connectors
Techflex
10 weeks
Minimal delays (add. 1-2 weeks)
Wire Covering
tesa tape
8 weeks
Minimal delays (add. 1-2 weeks)
Tape
Thomas & Betts
8 weeks
No impact
Trombetta
12 weeks
Moderate delays (add. 3-5 weeks)
Contactors
UMPCO Inc.
8 weeks
Minimal delays (add. 1-2 weeks)
Clamps
Unity Manufacturing
6 weeks
No impact
White-Rodgers Emerson
12 weeks
Minimal delays (add. 1-2 weeks)
Contactors
Yazaki
12 weeks
Minimal delays (add. 1-2 weeks)
Multi-pin Connectors
09/26/2022
The continuing shortage of microprocessors and electronic components, as well as other factors outside Waytek’s control, have caused some products to experience longer-than-expected lead times.
As a result, our suppliers’ shipments could fluctuate and larger customer orders could require additional time for fulfillment. We apologize for any inconvenience and are doing everything we can to stock and ship the parts you need.
If you have any questions about your orders, please contact our Customer Service Team. General questions or specific component lead time inquiries should be directed to [email protected] or 800-328-2724. Additional details around specific suppliers can be found below; scroll down to see updated lead times.
Updated Lead Times - See Chart Below
No Impact = standard lead time still applies
Minimal Impact = 1-2 weeks of additional lead time over standard
Moderate Impact = 3-5 weeks of additional lead time over standard
Major Impact = Unknown, at least double the standard lead time
Please note that standard lead times are averages of all parts carried for that manufacturer. Lead times for some components are longer than the average listed.
Supplier
Current Status
Standard Lead Time
Impacted
Product Offerings
3M
Moderate delays
8-10 weeks
Solderless terminals
AFC Cable Systems
No impact
6-8 weeks
Amphenol
Moderate delays
14-16 weeks
A Series Connectors
Ancor
No impact
6-8 weeks
Anderson Power
Minimal impact
6-8 weeks
SB Connectors
Aptiv (Formerly Delphi)
Moderate impact
20-22 weeks
Mutli-Pin Connectors & Terminal Reels
Bayco
No impact
6-8 weeks
Blue Sea Systems
Minimal delays
10-12 weeks
Battery Management
Carling Technologies
Moderate delays (add. 3-5 weeks)
12-14 weeks
Rocker Switches
Casco
No impact
8-10 weeks
Champlain Cable
Minimal delays (add. 1-2 weeks)
10-12 weeks
CAN-Bus Cable
Cole Hersee-A Littelfuse Brand
Minimal delays (add. 1-2 weeks)
10-12 weeks
Switches
DSG Canusa-Shawcor
No impact
8-10 weeks
Data Panel Corp
Moderate delays (add. 3-5 weeks)
8-10 weeks
Switching Devices
Delfingen
Minimal delays (add. 1-2 weeks)
10-12 weeks
Nylon Loom
Durham Manufacturing
No impact
6-8 weeks
Dynatex
No impact
6-8 weeks
E-Switch
No impact
10-12 weeks
Eaton
Moderate delays (add. 3-5 weeks)
8-10 weeks
Circuit Breakers & Power Distribution Modules
Eclipse Tools
Moderate delays (add. 3-5 weeks)
8-10 weeks
Hand Crimp Tools
General Cable
Minimal delays (add. 1-2 weeks)
8-10 weeks
Wire & Cable
GEP Power Products
Minimal delays (add. 1-2 weeks)
8-10 weeks
Power Distribution Modules
Gigavac
Moderate delays (add. 3-5 weeks)
14-16 weeks
Disconnects & Contactors
Grote
Minimal delays (add. 1-2 weeks)
8-10 weeks
Lights
HMI Systems
No impact
10-12 weeks
Hella
Minimal delays (add. 1-2 weeks)
10-12 weeks
Mini Relays
Hellermann Tyton
Minimal delays (add. 1-2 weeks)
8-10 weeks
Cable Ties
Heyco
Minimal delays (add. 1-2 weeks)
8-10 weeks
Clamps
Ideal Industries
Minimal delays (add. 1-2 weeks)
8-10 weeks
Clamps
Ideal Tridon
Minimal delays (add. 1-2 weeks)
8-10 weeks
Clamps
InPower
Minimal delays (add. 1-2 weeks)
6-8 weeks
Contactors
Klein Tools
No impact
6-8 weeks
Leviton
No impact
6-8 weeks
Supplier
Current Status
Standard Lead Time
Impacted
Product Offerings
Littelfuse
Minimal delays (add. 1-2 weeks)
12-14 weeks
Fuse & Fuse Holders
Lovato Electric Inc.
Moderate delays (add. 3-5 weeks)
10-12 weeks
Switches
MTA
Moderate delays (add. 3-5 weeks)
10-12 weeks
Fuse Holders
Marinco
Moderate delays (add. 3-5 weeks)
10-12 weeks
Battery Management
Master Appliance
Moderate delays (add. 3-5 weeks)
10-12 weeks
Heat Shrink Tools
Maxxima
No impact
6-8 weeks
Mechanical Products MP
Minimal delays (add. 1-2 weeks)
12-14 weeks
Circuit Protection
Molex
Moderate delays (add. 3-5 weeks)
14-16 weeks
Solderless Terminals
Nason
Moderate delays (add. 3-5 weeks)
10-12 weeks
Switches
Novita
No impact
6-8 weeks
Picker Components
Moderate delays (add. 3-5 weeks)
12-14 weeks
Mini & ISO 280 Relays
Pollak - Standard Motor Products
No impact
8-10 weeks
Switches
Pressmaster
Moderate delays (add. 3-5 weeks)
12-14 weeks
Hand Crimp Tools
ProMariner
Minimal delays (add. 1-2 weeks)
8-10 weeks
Inverters
Rennsteig Tools
No impact
6-8 weeks
Rostra Precision Controls Inc
No impact
6-8 weeks
Rowe Electronics
No impact
6-8 weeks
Safco
No impact
6-8 weeks
Sargent Tools by Oetiker
No impact
6-8 weeks
Scapa
No impact
6-8 weeks
Song Chuan
Moderate delays (add. 3-5 weeks)
30-32 weeks
Mini & ISO 280 Relays
Star Warning Systems
No impact
6-8 weeks
TE Connectivity
Major impact
20-22 weeks
Multi-Pin Connectors
TE-Raychem
Moderate delays (add. 3-5 weeks)
12-14 weeks
Wire Covering
Techflex
Minimal delays (add. 1-2 weeks)
8-10 weeks
Wire Covering
Tesa Tape
Minimal delays (add. 1-2 weeks)
8-10 weeks
Tape
Thomas & Betts
Minimal delays (add. 1-2 weeks)
8-10 weeks
Cable Ties
Trombetta
Minimal delays (add. 1-2 weeks)
8-10 weeks
Contactors
Umpco Inc.
No impact
6-8 weeks
Unity Manufacturing
Minimal delays (add. 1-2 weeks)
8-10 weeks
Lights
White-Rogers Emerson
Minimal delays (add. 1-2 weeks)
8-10 weeks
DC Contactors
Yazaki
Moderate delays (add. 3-5 weeks)
12-14 weeks
Multi-Pin Connectors
06/27/2022
The continuing shortage of microprocessors and electronic components has created enormous stress on the supply chain for electronic switches and components. Recent factory and port shutdowns in Asia have further interrupted the supply of materials used in these components. These factors outside Waytek’s control have caused some products to experience longer than expected lead times.
As a result, our suppliers’ shipments could fluctuate and larger customer orders could require additional time for fulfillment.
We apologize for any inconvenience this situation may cause and are doing everything we can to stock and ship the parts you need.
If you have any questions about your orders, please contact our Customer Service Team. General questions or specific component lead time inquiries should be directed to [email protected] or 800-328-2724.
Additional details around specific suppliers can be found below; scroll down to see updated lead times.
Updated Lead Times
No Impact = standard lead time still applies
Minimal Impact = 1-2 weeks of additional lead time over standard
Moderate Impact = 3-5 weeks of additional lead time over standard
Major Impact = Unknown, at least double the standard lead time
Please note that standard lead times are averages of all parts carried for that manufacturer. Lead times for some components are longer than the average listed.
Supplier
Current Status
Standard Lead Times
Impacted
Product Offerings
3M
Minimal delays (add. 1-2 weeks)
8-10 weeks
Solderless Terminals
AFC Cable Systems
No impact
6-8 weeks
Amphenol
Moderate delays (add. 3-5 weeks)
22-24 weeks
A Series Connectors
Ancor
No impact
6-8 weeks
Anderson Power Products
No impact
6-8 weeks
Aptiv (formerly Delphi)
Major impact
22-24 weeks
Multi-pin Connectors & Terminal Reels
Bayco
No impact
6-8 weeks
Blue Sea Systems
Moderate delays (add. 3-5 weeks)
14-16 weeks
Battery Management
Carling Technologies
Minimal delays (add. 1-2 weeks)
10-12 weeks
Rocker Switches
Casco
No impact
8-10 weeks
Champlain Cable
Minimal delays (add. 1-2 weeks)
10-12 weeks
CAN-Bus Cable
Cole Hersee - A Littelfuse Brand
Minimal delays (add. 1-2 weeks)
10-12 weeks
Switches
DSG Canusa - Shawcor
Minimal delays (add. 1-2 weeks)
10-12 weeks
Heat Shrink
Data Panel Corp
No impact
6-8 weeks
Delfingen
Minimal delays (add. 1-2 weeks)
10-12 weeks
Nylon Loom
Durham Manufacturing
No impact
6-8 weeks
Dynatex
No impact
6-8 weeks
E-Switch
No impact
10-12 weeks
Eaton
Moderate delays (add. 3-5 weeks)
20-22 weeks
Circuit Breakers & Power Distribution Modules
Eclipse Tools
No impact
6-8 weeks
GEP Power Products
Minimal delays (add. 1-2 weeks)
8-10 weeks
Power Distribution Modules
Gigavac
Moderate delays (add. 3-5 weeks)
14-16 weeks
Disconnects & Contactors
Grote
No impact
6-8 weeks
HMI Systems
No impact
10-12 weeks
Hella
Moderate delays (add. 3-5 weeks)
14-16 weeks
Mini Relays
Hellermann Tyton
Minimal delays (add. 1-2 weeks)
14-16 weeks
Cable Ties
Heyco
No impact
6-8 weeks
Ideal Industries
No impact
6-8 weeks
Ideal Tridon
No impact
6-8 weeks
InPower
Minimal delays (add. 1-2 weeks)
6-8 weeks
Contactors
Klein Tools
No impact
6-8 weeks
Leviton
No impact
6-8 weeks
Supplier
Current Status
Standard Lead Times
Impacted
Product Offerings
Littelfuse
Moderate delays (add. 3-5 weeks)
14-16 weeks
Fuse & Fuse Holders
Lovato Electric Inc
No impact
6-8 weeks
MTA
Minimal delays (add. 1-2 weeks)
8-10 weeks
Fuse Holders
Marinco
Minimal delays (add. 1-2 weeks)
10-12 weeks
Battery Management
Master Appliance
No impact
6-8 weeks
Maxxima
No impact
6-8 weeks
Mechanical Products MP
Minimal delays (add. 1-2 weeks)
12-14 weeks
Circuit Protection
Molex
Moderate delays (add. 3-5 weeks)
18-20 weeks
Solderless Terminals
Nason
No impact
6-8 weeks
Novita
No impact
6-8 weeks
Picker Components
Moderate delays (add. 3-5 weeks)
16-18 weeks
Pollak - Standard Motor Products
Minimal delays (add. 1-2 weeks)
8-10 weeks
Switches
Pressmaster
No impact
6-8 weeks
ProMariner
Minimal delays (add. 1-2 weeks)
8-10 weeks
Inverters
Rennsteig Tools
No impact
6-8 weeks
Rostra Precision Controls Inc
No impact
6-8 weeks
Rowe Electronics
No impact
6-8 weeks
Safco
No impact
6-8 weeks
Sargent Tools by Oetiker
No impact
6-8 weeks
Scapa
No impact
6-8 weeks
Song Chuan
Major impact
38-40 weeks
Mini & ISO 280 Relays
Star Warning Systems
No impact
6-8 weeks
TE Connectivity
Major Impact
20-22 weeks
Multi-Pin Connectors
TE - Raychem
Moderate delays (add. 3-5 weeks)
12-14 weeks
Wire Covering
Techflex
Minimal delays (add. 1-2 weeks)
8-10 weeks
Wire Covering
Tesa Tape
Minimal delays (add. 1-2 weeks)
8-10 weeks
Tape
Thomas & Betts
Minimal delays (add. 1-2 weeks)
8-10 weeks
Cable Ties
Trombetta
Minimal delays (add. 1-2 weeks)
8-10 weeks
Contactors
Umpco Inc
No impact
6-8 weeks
Unity Manufacturing
No impact
6-8 weeks
White-Rodgers Emerson
Moderate delays (add. 3-5 weeks)
12-14 weeks
DC Contactors
Yazaki
Moderate delays (add. 3-5 weeks)
12-14 weeks
Multi-Pin Connectors
03/08/2022
Global supply chain shortages and increased demand on raw materials used in some of the parts we carry have continued in 2022, due to the COVID-19 pandemic and world events.
Currently, our suppliers’ shipments could fluctuate and larger customer orders could require additional time for fulfillment.
We apologize for any inconvenience this situation may cause and are doing everything we can to stock and ship the parts you need.
If you have any questions about your orders, please contact our Customer Service Team. General questions or specific component lead time inquiries should be directed to [email protected] or 800-328-2724.
Additional details around specific suppliers can be found below; scroll down to see updated lead times.
Updated Lead Times
No Impact = standard lead time still applies
Minimal Impact = 1-2 weeks of additional lead time over standard
Moderate Impact = 3-5 weeks of additional lead time over standard
Major Impact = Unknown, at least double the standard lead time
Please note that standard lead times are averages of all parts carried for that manufacturer. Lead times for some components are longer than the average listed.
Supplier
Current Status
Standard Lead Time
Impacted
Product Offerings
3M
Minimal delays (add. 1-2 weeks)
4-5 weeks
Wire Terminals
AFC Cable Systems
No impact
4-6 weeks
Amphenol
Moderate delays (add. 3-5 weeks)
20-24 weeks
AT Series Connectors
Ancor
No impact
4-6 weeks
Anderson Power Products
No impact
4-6 weeks
Aptiv (formerly Delphi)
Major impact
24-26 weeks
Multi-pin Connectors & Terminal Reels
Bayco
No impact
4-6 weeks
Blue Sea Systems
Moderate delays (add. 3-5 weeks)
14-16 weeks
Battery Management
Carling Technologies
Minimal delays (add. 1-2 weeks)
10-12 weeks
Rocker Switches
Casco
No impact
8-10 weeks
Champlain Cable
Minimal delays (add. 1-2 weeks)
10-12 weeks
CAN-Bus Cable
Cole Hersee - A Littelfuse Brand
Minimal delays (add. 1-2 weeks)
10-12 weeks
Switches
DSG Canusa - Shawcor
Minimal delays (add. 1-2 weeks)
6-7 weeks
Heat Shrink
Data Panel Corp
No impact
4-6 weeks
Delfingen
Minimal delays (add. 1-2 weeks)
9-10 weeks
Nylon Loom
Durham Manufacturing
No impact
4-6 weeks
Dynatex
No impact
4-6 weeks
E-Switch
No impact
10-12 weeks
Eaton
Moderate delays (add. 3-5 weeks)
18-22 weeks
Circuit Breakers & Power Distribution Modules
Eclipse Tools
No impact
4-6 weeks
GEP Power Products
Minimal delays (add. 1-2 weeks)
8-10 weeks
Power Distribution Modules
Gigavac
Moderate delays (add. 3-5 weeks)
12-14 weeks
Disconnects & Contactors
Grote
No impact
6-8 weeks
HMI Systems
No impact
10-12 weeks
Hella
Moderate delays (add. 3-5 weeks)
14-16 weeks
Mini Relays
Hellermann Tyton
Minimal delays (add. 1-2 weeks)
8-10 weeks
Cable Tie Mounting
Heyco
No impact
4-6 weeks
Ideal Industries
No impact
4-6 weeks
Ideal Tridon
No impact
4-6 weeks
InPower
Minimal delays (add. 1-2 weeks)
6-8 weeks
Klein Tools
No impact
4-6 weeks
Leviton
No impact
4-6 weeks
Littelfuse
Moderate delays (add. 3-5 weeks)
14-16 weeks
Fuse & Fuse Holders
Supplier
Current Status
Standard Lead Time
Impacted
Product Offerings
Lovato Electric Inc
No impact
4-6 weeks
MTA
Minimal delays (add. 1-2 weeks)
8-10 weeks
Fuse Holders
Marinco
Minimal delays (add. 1-2 weeks)
8-10 weeks
Battery Management
Master Appliance
No impact
4-6 weeks
Maxxima
No impact
4-6 weeks
Mechanical Products MP
Minimal delays (add. 1-2 weeks)
14-16 weeks
Circuit Protection
Molex
Moderate delays (add. 3-5 weeks)
18-20 weeks
Solderless Terminals
Nason
No impact
6-8 weeks
Novita
No impact
4-6 weeks
Picker Components
Moderate delays (add. 3-5 weeks)
15-17 weeks
Mini & ISO 280 Relays
Pollak - Standard Motor Products
Minimal delays (add. 1-2 weeks)
8-10 weeks
Switches
Pressmaster
No impact
6-8 weeks
ProMariner
Minimal delays (add. 1-2 weeks)
8-10 weeks
Inverters
Rennsteig Tools
No impact
4-6 weeks
Rostra Precision Controls Inc
No impact
4-6 weeks
Rowe Electronics
No impact
4-6 weeks
Safco
No impact
4-6 weeks
Sargent Tools by Oetiker
No impact
4-6 weeks
Scapa
No impact
4-6 weeks
Song Chuan
Major impact
38-42 weeks
Mini & ISO 280 Relays
Star Warning Systems
No impact
6-8 weeks
Switchcraft - Conxall
No impact
6-8 weeks
TE Connectivity
Major impact
10-22 weeks
Multi-Pin Connectors
TE - Raychem
Moderate delays (add. 3-5 weeks)
12-14 weeks
Wire Covering
Techflex
Minimal delays (add. 1-2 weeks)
6-8 weeks
Wire Covering
Tesa Tape
No impact
6-8 weeks
Thomas & Betts
Minimal delays (add. 1-2 weeks)
8-10 weeks
Cable Ties
Trombetta
No impact
8-10 weeks
Umpco Inc
No impact
4-6 weeks
Unity Manufacturing
No impact
4-6 weeks
White - Rodgers Emerson
Moderate delays (add. 3-5 weeks)
12-14 weeks
DC Contactors
Yazaki
Moderate delays (add. 3-5 weeks)
12-14 weeks
Multi-Pin Connectors