Home

Same day shipping on most in-stock orders placed by 3:30 p.m. CST 800-328-2724

Supply Chain Disruptions

6/16/2024

Some products continue to have extended lead times while others have improved. Our suppliers’ shipments could fluctuate and larger orders may require additional time for fulfillment. If you have questions about your orders or lead times, please contact our Customer Service Team at [email protected] or 800-328-2724.

Updated Lead Times - See Chart Below

NOTE: Lead times below are averages of all parts carried for that manufacturer. To see the lead time for a single part, look up the part on the Waytek website—each part includes future availability and lead time info.

-  No Impact = standard lead time still applies

 Minimal Delays = No change over last 60 days and still delayed over standard lead time. 

-  Minimal Impact (green arrow) = 1-2 weeks of additional lead time over standard. *Reduced lead times over the last 60 days

-  Minimal Impact (yellow arrow) = 1-2 weeks of additional lead time over standard, no changes over the last 60 days 

-  Moderate Impact (orange arrow) = 3-5 weeks of additional lead time over standard,

*Please note that standard lead times are averages of all parts carried for that manufacturer. Lead times for some components are longer than the average listed.

Supplier

Standard Lead Times*

Current Status (Additional Lead Time)

Impacted Products

3M

 Minimal delays (add. 1-2 weeks)

8-10 weeks

Heat Shrink Solderless Terminals

ACT 

 Minimal delays (add. 1-2 weeks)

8-10 weeks

Standard Cable Ties

AFC Cable Systems

 Minimal delays (add. 1-2 weeks)

8-10 weeks

Conduit

Amphenol

  Minimal delays (add. 1-2 weeks)

14-16 weeks

A Series Connectors

Anderson Power

 Minimal delays

6-8 weeks

SB Connectors

Aptiv (Formerly Delphi)

 Moderate delays (add. 3-5 weeks)

14-16 weeks

Multi-pin Connectors & Terminal Reels

Blue Sea Systems

  Minimal delays (add. 1-2 weeks)

14-16 weeks

Fuse Blocks

CIT Relay & Switch

 Minimal delays

8-10 weeks

Mini ISO Relays

Carling Technologies

 Minimal delays

8-10 weeks

Rocker Switches

Casco

 Minimal delays (add. 1-2 weeks)

8-10 weeks

Champlain Cable

  Minimal delays (add. 1-2 weeks)

10-12 weeks

Can-bus Cable

Cole Hersee - A Littelfuse Brand

 Minimal delays

8-10 weeks

Switching Devices

DSG Canusa

 Minimal delays

8-10 weeks

Heat Shrink

Data Panel Corp

  Minimal delays (add. 1-2 weeks)

10-12 weeks

Disconneccts

Delfingen

  Minimal delays (add. 1-2 weeks)

10-12 weeks

Wire Covering

Deutsch

  Minimal delays (add. 1-2 weeks)

10-12 weeks

Crimpers

Durham Manufacturing

 No Impact

6-8 weeks

Dynatex

 No Impact

6-8 weeks

East Penn Manufacturing

 Minimal delays

12-14 weeks

Wire & Cable 

Eaton

 Moderate delays (add. 3-5 weeks)

14-16 weeks

Circuit Breakers & Power Distribution Modules

Eclipse Tools

 No Impact

6-8 weeks

Egis Mobile Electric

 Minimal delays

8-10 weeks

Fuse Blocks 

Essentra Plastics

 Minimal delays

8-10 weeks

Clips & Clamps

GEP Power Products

 Minimal delays

8-10 weeks

Power Distribution Modules

GIGAVAC

 Moderate delays (add. 3-5 weeks)

14-16 weeks

Contactors

General Cable

 Minimal delays (add. 1-2 weeks)

12-14 weeks

Wire & Cable 

Grote

 Minimal delays (add. 1-2 weeks)

8-10 weeks

Lights

HELLA

 Moderate delays (add. 3-5 weeks)

12-14 weeks

Mini ISO Relays

HMI Systems

 No Impact

8-10 weeks

HellermannTyton

 Minimal delays (add. 1-2 weeks)

10-12 weeks

Standard Cable Ties

Heyco

 No Impact

8-10 weeks

Ideal Industries

 No Impact

8-10 weeks

Ideal Tridon

 No Impact

8-10 weeks

InPower

 No Impact

8-10 weeks

Klein Tools

 No Impact

6-8 weeks

Supplier

Standard Lead Times*

Current Status (Additional Lead Time)

Impacted Products

Leviton

 Minimal delays

8-10 weeks

Switching Devices

Littelfuse

  Minimal delays (add. 1-2 weeks)

12-14 weeks

Fuse & Fuse Holder

Lovato Electric Inc

 Minimal delays

8-10 weeks

Switching Devices

MTA

 No Impact

8-10 weeks

Marinco

 Minimal delays

8-10 weeks

Battery Management Devices

Master Appliance

 No Impact

8-10 weeks

Mastervolt

  Minimal delays (add. 1-2 weeks)

10-12 weeks

Battery Management Devices

Maxxima

 Minimal delays

10-12 weeks

Lights

Mechanical Products 

  Minimal delays (add. 1-2 weeks)

8-10 weeks

Circuit Breakers 

Molex

 Moderate delays (add. 3-5 weeks)

12-14 weeks

Solderless Terminals

NOCO Company

 No Impact

8-10 weeks

Nason

 Minimal delays

10-12 weeks

Switching Devices

OptiFuse

  Minimal delays (add. 1-2 weeks)

12-14 weeks

Circuit Breakers

Picker Components

 Minimal delays

10-12 weeks

Mini ISO Relays

Pollak

 Minimal delays

8-10 weeks

Switching Devices

Pressmaster

 Minimal delays

12-14 weeks

Crimpers

ProMariner

 Minimal delays (add. 1-2 weeks)

8-10 weeks

Battery Management Devices

Rennsteig Tools

  Minimal delays (add. 1-2 weeks)

8-10 weeks

Crimpers

Rowe Electronics

 No Impact

8-10 weeks

Safco

 No Impact

6-8 weeks

Sargent Tools Oetiker

 No Impact

8-10 weeks

Scapa

 No Impact

8-10 weeks

Sealcon

 No Impact

8-10 weeks

Song Chuan

  Minimal delays (add. 1-2 weeks)

22-26 weeks

Mini ISO Relays

Southwire

Moderate delays

14-16 weeks

Wire & Cable 

TE - Raychem

 Moderate delays

14-16 weeks

Wire Covering

TE Connectivity

 Minimal delays

12-14 weeks

Multi-pin Connectors 

Techflex

  Minimal delays (add. 1-2 weeks)

8-10 weeks

Wire Covering

tesa

 Minimal delays

8-10 weeks

Tape

Thomas & Betts

 No Impact

8-10 weeks

Cable Ties 

Trombetta

  Minimal delays (add. 1-2 weeks)

12-14 weeks

Contactors

UMPCO Inc.

 Minimal delays

8-10 weeks

Clamps

Unity Manufacturing

 No Impact

8-10 weeks

White-Rodgers Emerson

  Minimal delays (add. 1-2 weeks)

12-14 weeks

Contactors

Yazaki

  Minimal delays (add. 1-2 weeks)

12-14 weeks

Multi-pin Connectors

4/5/2024

Some products continue to have extended lead times while others have improved. Our suppliers’ shipments could fluctuate and larger orders may require additional time for fulfillment. If you have questions about your orders or lead times, please contact our Customer Service Team at [email protected] or 800-328-2724.

Updated Lead Times - See Chart Below

NOTE: Lead times below are averages of all parts carried for that manufacturer. To see the lead time for a single part, look up the part on the Waytek website—each part includes future availability and lead time info.

- No Impact = standard lead time still applies

- Minimal Impact (green) = 1-2 weeks of additional lead time over standard. *Reduced lead times over the last 60 days

- Minimal Impact (yellow) = 1-2 weeks of additional lead time over standard, no changes over the last 60 days 

- Moderate Impact (orange) = 3-5 weeks of additional lead time over standard,

- Major Impact (red)= Unknown, at least double the standard lead time

*Please note that standard lead times are averages of all parts carried for that manufacturer. Lead times for some components are longer than the average listed.

Supplier

Standard Lead Times*

Current Status (Additional Lead Time)

Impacted Product Offerings

3M

Minimal Delays (add. 1-2 weeks)

8 Weeks ↑

Heat Shrink Solderless Terminals

ACT

Minimal delays (add. 1-2 weeks)

8-10 weeks

Standard Cable Ties

AFC Cable Systems

Minimal delays (add. 1-2 weeks)

8-10 weeks

Conduit

Amphenol Sine Systems

Minimal Delays (add. 1-2 Weeks)

8 Weeks

A Series Connectors

Anderson Power

Minimal delays (add. 1-2 weeks)

6 Weeks

SB Connectors

Aptiv (Formerly Delphi)

Moderate delays (add. 3-5 weeks)

16 Weeks

Multi-pin Connectors & Terminal Reels

Bayco

No impact

6 Weeks

Blue Sea Systems

Minimal delays (add. 1-2 weeks)

14 Weeks

Fuse Blocks

CIT Relay & Switch

Minimal Delays

10 Weeks

Mini ISO Relays

Carling Technologies

Minimal delays (add. 1-2 weeks)

10 Weeks

Rocker Switches

Casco

No impact

8 Weeks

Champlain Cable

Minimal delays (add. 1-2 weeks)

12 Weeks

Can-bus Cable

Cole Hersee-A Littelfuse Brand

Minimal delays (add. 1-2 weeks)

10 Weeks

Switching Devices

DSG Canusa - Shawcor

Minimal delays (add. 1-2 weeks)

10 Weeks

Heat Shrink

Data Panel Corp

Minimal delays (add. 1-2 weeks)

12 Weeks

Disconneccts

Delfingen

Minimal delays (add. 1-2 weeks)

12 Weeks

Wire Covering

Deutsch

Minimal delays (add. 1-2 weeks)

12 Weeks

Crimpers

Durham Manufacturing

No impact

6 Weeks

Dynatex

No impact

6 Weeks

East Penn Manufacturing

Minimal delays (add. 1-2 weeks)

12 Weeks

Wire & Cable 

Eaton

Moderate delays (add. 3-5 weeks)

16 Weeks

Circuit Breakers & Power Distribution Modules

Eclipse Tools

No impact

6 Weeks

Egis Mobile Electric

Minimal delays (add. 1-2 Weeks)

8 Weeks

Fuse Blocks 

Essentra Plastics

Minimal delays (add. 1-2 weeks)

10 Weeks

Clips & Clamps

GEP Power Products

Minimal delays (add. 1-2 weeks)

8 Weeks

Power Distribution Modules

GIGAVAC

Moderate delays (add. 3-5 weeks)

14 Weeks

Contactors

General Cable

Minimal delays (add. 1-2 weeks)

14 Weeks

Wire & Cable 

Grote

Minimal delays (add. 1-2 weeks)

10 Weeks

Lights

HELLA

Moderate delays (add. 3-5 weeks)

14 Weeks

Mini ISO Relays

HMI Systems

No impact

8 Weeks

HellermannTyton

Minimal delays (add. 1-2 weeks)

12 Weeks

Standard Cable Ties

Heyco

No impact

8 Weeks

Ideal Industries

No impact

8 Weeks

Ideal Tridon

No impact

8 Weeks

InPower

No impact

8 Weeks

Klein Tools

No impact

6 Weeks

Supplier

Standard Lead Times*

Current Status (Additional Lead Time)

Impacted Product Offerings

Leviton

Minimal delays (add. 1-2 weeks)

8 Weeks

Switching Devices

Littelfuse

Minimal delays (add. 1-2 Weeks)

14 Weeks

Fuse & Fuse Holder

Lovato Electric Inc

Minimal delays (add. 1-2 weeks)

8 Weeks

Switching Devices

MTA

No impact

10 Weeks

Marinco

Minimal delays (add. 1-2 weeks)

8 Weeks

Battery Management Devices

Master Appliance

No impact

8 Weeks

Mastervolt

Minimal delays (add. 1-2 weeks)

12 Weeks

Battery Management Devices

Maxxima

Minimal delays (add. 1-2 weeks)

10 Weeks

Lights

Mechanical Products 

Minimal delays (add. 1-2 weeks)

10 Weeks

Circuit Breakers 

Molex

Moderate delays (add. 3-5 weeks)

14 Weeks

Solderless Terminals

NOCO Company

No impact

8 Weeks

Nason

Minimal delays (add. 1-2 weeks)

10 Weeks

Switching Devices

OptiFuse

Minimal delays (add. 1-2 weeks)

14 Weeks

Circuit Breakers

Picker Components

Minimal delays (add. 1-2 weeks)

10 Weeks

Mini ISO Relays

Pollak

Minimal delays (add. 1-2 weeks)

8 Weeks

Switching Devices

Pressmaster

Minimal delays (add. 1-2 weeks)

12 Weeks

Crimpers

ProMariner

Minimal delays (add. 1-2 weeks)

8 Weeks

Battery Management Devices

Rennsteig Tools

Minimal delays (add. 1-2 weeks)

12 Weeks

Crimpers

Rowe Electronics

No impact

8 Weeks

Safco

No impact

6 Weeks

Sargent Tools Oetiker

No impact

8 Weeks

Scapa

No impact

8 Weeks

Sealcon

No impact

8 Weeks

Song Chuan

Minimal delays (add. 1-2 Weeks)

26 Weeks

Mini ISO Relays

Southwire

Moderate delays (add. 3-5 weeks)

16 Weeks

Wire & Cable 

TE - Raychem

Moderate delays (add. 3-5 weeks)

16 Weeks

Wire Covering

TE Connectivity

Minimal delays (add. 1-2 weeks)

12 Weeks

Multi-pin Connectors 

Techflex

Minimal delays (add. 1-2 Weeks)

10 Weeks

Wire Covering

Tesa Tape

Minimal delays (add. 1-2 weeks)

8 Weeks

Tape

Thomas & Betts

No impact

10 Weeks

Cable Ties 

Trombetta

Minimal delays (add. 1-2 weeks)

14 Weeks

Contactors

UMPCO Inc.

Minimal delays (add. 1-2 weeks)

8 Weeks

Clamps

Unity Manufacturing

No impact

8 Weeks

White-Rodgers Emerson

Minimal delays (add. 1-2 weeks)

14 Weeks

Contactors

Yazaki

Minimal delays (add. 1-2 weeks)

14 Weeks

Multi-pin Connectors

9/12/2023

Some products continue to have extended lead times while others have improved. Our suppliers’ shipments could fluctuate and larger orders may require additional time for fulfillment. If you have questions about your orders or lead times, please contact our Customer Service Team at [email protected] or 800-328-2724.

Updated Lead Times - See Chart Below

NOTE: Lead times below are averages of all parts carried for that manufacturer. To see the lead time for a single part, look up the part on the Waytek website—each part includes future availability and lead time info.

- No Impact = standard lead time still applies

- Minimal Impact (green) = 1-2 weeks of additional lead time over standard. *Reduced lead times over the last 60 days

- Minimal Impact (yellow) = 1-2 weeks of additional lead time over standard, no changes over the last 60 days 

- Moderate Impact (orange) = 3-5 weeks of additional lead time over standard,

- Major Impact (red)= Unknown, at least double the standard lead time

*Please note that standard lead times are averages of all parts carried for that manufacturer. Lead times for some components are longer than the average listed.

Supplier

Standard Lead Time*

Current Status (Additional Lead Time)

Impacted Product Offerings

3M

8 weeks

Minimal delays (add. 1-2 weeks)

Heat Shrink Solderless Terminals

ACT

8 weeks

Minimal delays (add. 1-2 weeks)

Standard Cable Ties

AFC Cable Systems

8 weeks

Minimal delays (add. 1-2 weeks)

Conduit

Amphenol Sine Systems

14 weeks

Minimal delays (add. 1-2 weeks)

A Series Connectors

Anderson Power

6 Weeks

Minimal delays (add. 1-2 weeks)

SB Connectors

Aptiv (Formerly Delphi)

16 Weeks

Moderate delays (add. 3-5 weeks)

Multi-pin Connectors & Terminal Reels

Bayco

6 Weeks

No impact

Blue Sea Systems

14 Weeks

Moderate delays (add. 3-5 weeks)

Fuse Blocks

CIT Relay & Switch

10 Weeks 

Minimal delays (add. 1-2 weeks)

Mini ISO Relays

Carling Technologies

12 Weeks

Minimal delays (add. 1-2 weeks)

Rocker Switches

Casco

8 Weeks

No impact

Champlain Cable

12 Weeks

Minimal delays (add. 1-2 weeks)

Can-bus Cable

Cole Hersee-A Littelfuse Brand

10 Weeks

Minimal delays (add. 1-2 weeks)

Switching Devices

DSG Canusa - Shawcor

10 Weeks

Minimal delays (add. 1-2 weeks)

Heat Shrink

Data Panel Corp

10 Weeks

Minimal delays (add. 1-2 weeks)

Delfingen

12 Weeks

Minimal delays (add. 1-2 weeks)

Wire Covering

Deutsch

12 Weeks

Minimal delays (add. 1-2 weeks)

Crimpers

Durham Manufacturing

6 Weeks

No impact

Dynatex

6 Weeks

No impact

East Penn Manufacturing

12 Weeks

Minimal delays (add. 1-2 weeks)

Wire & Cable 

Eaton

18 Weeks

Moderate delays (add. 3-5 weeks)

Circuit Breakers & Power Distribution Modules

Eclipse Tools

6 Weeks

No impact

Egis Mobile Electric

8 Weeks

Minimal delays (add. 1-2 weeks)

Fuse Blocks

Essentra Plastics

10 Weeks

Minimal delays (add. 1-2 weeks)

Clips & Clamps

GEP Power Products

8 Weeks

Minimal delays (add. 1-2 weeks)

Power Distribution Modules

GIGAVAC

14 Weeks

Moderate delays (add. 3-5 weeks)

Contactors

General Cable

14 Weeks

Minimal delays (add. 1-2 weeks)

Wire & Cable 

Grote

10 Weeks

Minimal delays (add. 1-2 weeks)

Lights

HELLA

14 Weeks

Moderate delays (add. 3-5 weeks)

Mini ISO Relays

HMI Systems

8 Weeks

No impact

HellermannTyton

12 Weeks

Minimal delays (add. 1-2 weeks)

Standard Cable Ties

Heyco

8 Weeks

No impact

Ideal Industries

8 Weeks

No impact

Ideal Tridon

8 Weeks

No impact

InPower

8 Weeks

No impact

Klein Tools

6 Weeks

No impact

Supplier

Standard Lead Time*

Current Status (Additional Lead Time)

Impacted Product Offerings

Leviton

8 Weeks

Minimal delays (add. 1-2 weeks)

Switching Devices

Littelfuse

14 Weeks

Minimal delays (add. 1-2 weeks)

Fuse & Fuse Holder

Lovato Electric Inc

8 Weeks

Minimal delays (add. 1-2 weeks)

Switching Devices

MTA

10 Weeks

No impact

Marinco

8 Weeks

Minimal delays (add. 1-2 weeks)

Battery Management Devices

Master Appliance

8 Weeks

No impact

Mastervolt

12 Weeks

Minimal delays (add. 1-2 weeks)

Battery Management Devices

Maxxima

10 Weeks

Minimal delays (add. 1-2 weeks)

Lights

Mechanical Products 

10 Weeks

Minimal delays (add. 1-2 weeks)

Circuit Breakers 

Molex

14 Weeks

Moderate delays (add. 3-5 weeks)

Solderless Terminals

NOCO Company

8 Weeks

No impact

Nason

10 Weeks

Minimal delays (add. 1-2 weeks)

Switching Devices

OptiFuse

14 Weeks

Minimal delays (add. 1-2 weeks)

Circuit Breakers

Picker Components

10 Weeks

Minimal delays (add. 1-2 weeks)

Mini ISO Relays

Pollak

8 Weeks

Minimal delays (add. 1-2 weeks)

Switching Devices

Pressmaster

12 Weeks

Minimal delays (add. 1-2 weeks)

Crimpers

ProMariner

8 Weeks

Minimal delays (add. 1-2 weeks)

Battery Management Devices

Rennsteig Tools

12 Weeks

Minimal delays (add. 1-2 weeks)

Crimpers

Rowe Electronics

8 Weeks

No impact

Safco

6 Weeks

No impact

Sargent Tools Oetiker

8 Weeks

No impact

Scapa

8 Weeks

No impact

Sealcon

8 Weeks

No impact

Song Chuan

26 Weeks

Minimal delays (add. 1-2 weeks)

Mini ISO Relays

Southwire

16 Weeks

Moderate delays (add. 3-5 weeks)

Wire & Cable 

TE - Raychem

16 Weeks

Moderate delays (add. 3-5 weeks)

Wire Covering

TE Connectivity

12 Weeks

Minimal delays (add. 1-2 weeks)

Multi-pin Connectors 

Techflex

10 Weeks

Minimal delays (add. 1-2 weeks)

Wire Covering

Tesa Tape

8 Weeks

Minimal delays (add. 1-2 weeks)

Tape

Thomas & Betts

10 Weeks

No impact

Cable Ties 

Trombetta

14 Weeks

Minimal delays (add. 1-2 weeks)

Contactors

UMPCO Inc.

8 Weeks

Minimal delays (add. 1-2 weeks)

Clamps

Unity Manufacturing

8 Weeks

No impact

White-Rodgers Emerson

14 Weeks

Minimal delays (add. 1-2 weeks)

Contactors

Yazaki

14 Weeks

Minimal delays (add. 1-2 weeks)

Multi-pin Connectors

4/4/2023

Some products continue to have extended lead times while others have improved. Our suppliers’ shipments could fluctuate and larger orders may require additional time for fulfillment. If you have questions about your orders or lead times, please contact our Customer Service Team at [email protected] or 800-328-2724.

Updated Lead Times - See Chart Below

NOTE: Lead times below are averages of all parts carried for that manufacturer. To see the lead time for a single part, look up the part on the Waytek website—each part includes future availability and lead time info.

- No Impact = standard lead time still applies

- Minimal Impact (green) = 1-2 weeks of additional lead time over standard. *Reduced lead times over the last 60 days

- Minimal Impact (yellow) = 1-2 weeks of additional lead time over standard, no changes over the last 60 days 

- Moderate Impact (orange) = 3-5 weeks of additional lead time over standard,

- Major Impact (red)= Unknown, at least double the standard lead time

*Please note that standard lead times are averages of all parts carried for that manufacturer. Lead times for some components are longer than the average listed.

Supplier

Standard Lead Time*

Current Status (Additional Lead Time)

Impacted Product Offerings

3M

8 weeks

Minimal delays (add. 1-2 weeks)

Solderless Terminals

ACT

6 weeks

Minimal delays (add. 1-2 weeks)

Standard Cable Ties

AFC Cable Systems

8 weeks

Minimal delays (add. 1-2 weeks)

Conduit

Amphenol Sine Systems

18 weeks

Minimal delays (add. 1-2 weeks)*

A series Connectors

Anderson Power

6 weeks

Minimal delays (add. 1-2 weeks)

SB Connectors

Aptiv (Formerly Delphi)

18 weeks

Moderate delays (add. 3-5 weeks)

Multi-pin Connectors & Terminal Reels

Bayco

6 Weeks

No impact

Blue Sea Systems

10 Weeks

Minimal delays (1-2 weeks)*

Battery Management

CIT Relay & Switch

14 Weeks 

Minimal delays (1-2 weeks)*

Mini ISO Relays

Carling Technologies

14 Weeks

Minimal delays (add. 1-2 weeks)

Rocker Switches

Casco

8 weeks

No impact

Champlain Cable

10 weeks

Minimal delays (add. 1-2 weeks)

Can-bus Cable

Cole Hersee-A Littelfuse Brand

10 weeks

Minimal delays (add. 1-2 weeks)*

Switching Devices

DSG Canusa - Shawcor

10 weeks

Minimal delays (add. 1-2 weeks)

Heat Shrink

Data Panel Corp

10 weeks

Minimal delays (add. 1-2 weeks)

Delfingen

12 weeks

Minimal delays (add. 1-2 weeks)

Wire Covering

Deutsch

12 weeks

Minimal delays (add. 1-2 weeks)

Crimpers

Durham Manufacturing

6 weeks

No impact

Dynatex

6 weeks

No impact

East Penn Manufacturing

8 weeks

Minimal delays (add. 1-2 weeks)

Eaton

18 weeks

Moderate delays (add. 3-5 weeks)

Circuit Breakers & Power Distribution Modules

Eclipse Tools

6 weeks

No impact

Egis Mobile Electric

8 weeks

Minimal delays (add. 1-2 weeks)

Essentra Plastics

10 weeks

Minimal delays (add. 1-2 weeks)

Clips & Clamps

GEP Power Products

10 weeks

Minimal delays (add. 1-2 weeks)

Power Distribution Modules

GIGAVAC

14 weeks

Moderate delays (add. 3-5 weeks)

Contactors

General Cable

10 weeks

Minimal delays (add. 1-2 weeks)

Wire & Cable 

Grote

10 weeks

Minimal delays (add. 1-2 weeks)

Lights

HELLA

14 weeks

Moderate delays (add. 3-5 weeks)

Mini ISO Relays

HMI Systems

8 weeks

No impact

HellermannTyton

10 weeks

Minimal delays (add. 1-2 weeks)

Standard Cable Ties

Heyco

8 weeks

No impact

Ideal Industries

8 weeks

No impact

Ideal Tridon

8 weeks

No impact

InPower

8 weeks

No impact

Klein Tools

6 weeks

No impact

Supplier

Standard Lead Time*

Current Status (Additional Lead Time)

Impacted Product Offerings

Leviton

8 weeks

Minimal delays (add. 1-2 weeks)

Switching Devices

Littelfuse

14 weeks

Minimal delays (1-2 weeks)*

Fuse & Fuse Holder

Lovato Electric Inc

8 weeks

Minimal delays (add. 1-2 weeks)

Switching Devices

MTA

10 weeks

No impact

Marinco

12 weeks

Minimal delays (add. 1-2 weeks)

Battery Management Devices

Master Appliance

8 weeks

No impact

Mastervolt

12 weeks

Minimal delays (add. 1-2 weeks)

Battery Management Devices

Maxxima

8 weeks

Minimal delays (add. 1-2 weeks)

Lights

Mechanical Products MP

12 weeks

Minimal delays (add. 1-2 weeks)

Circuit Breakers 

Molex

18 weeks

Moderate delays (add. 3-5 weeks)

Solderless Terminals

NOCO Company

8 weeks

No impact

Nason

10 weeks

Minimal delays (add. 1-2 weeks)

Switching Devices

OptiFuse

14 weeks

Minimal delays (add. 1-2 weeks)

Circuit Breakers

Picker Components

14 weeks

Minimal delays (add. 1-2 weeks)

Mini ISO Relays

Pollak

12 weeks

Minimal delays (add. 1-2 weeks)

Switching Devices

Pressmaster

12 weeks

Minimal delays (add. 1-2 weeks)

Crimpers

ProMariner

10 weeks

Minimal delays (add. 1-2 weeks)

Battery Management Devices

Rennsteig Tools

12 weeks

Minimal delays (add. 1-2 weeks)

Crimpers

Rowe Electronics

8 weeks

No impact

Safco

6 weeks

No impact

Sargent Tools Oetiker

8 weeks

Minimal delays (add. 1-2 weeks)

Crimpers

Scapa

8 weeks

No impact

Sealcon

8 weeks

No impact

Song Chuan

26 weeks

Minimal delays (1-2 weeks)*

Mini ISO Relays

Southwire

12 weeks

Minimal delays (add. 1-2 weeks)

Wire & Cable 

TE - Raychem

14 weeks

Moderate delays (add. 3-5 weeks)

Wire Covering

TE Connectivity

12 weeks

Moderate delays (add. 3-5 weeks)

Multi-pin Connectors 

Techflex

10 weeks

Minimal delays (1-2 weeks)*

Wire Covering

Tesa Tape

8 weeks

Minimal delays (add. 1-2 weeks)

Tape

Thomas & Betts

10 weeks

No impact

Cable Ties

Trombetta

14 weeks

Moderate delays (add. 3-5 weeks)

Contactors

UMPCO Inc.

8 weeks

Minimal delays (add. 1-2 weeks)

Clamps

Unity Manufacturing

8 weeks

No impact

White-Rodgers Emerson

14 weeks

Minimal delays (add. 1-2 weeks)

Contactors

Yazaki

14 weeks

Minimal delays (add. 1-2 weeks)

Multi-pin Connectors

12/29/2022

Some products continue to have extended lead times while others have improved. Our suppliers’ shipments could fluctuate and larger orders may require additional time for fulfillment. If you have questions about your orders or lead times, please contact our Customer Service Team at [email protected] or 800-328-2724.

Updated Lead Times - See Chart Below

NOTE: Lead times below are averages of all parts carried for that manufacturer. To see the lead time for a single part, look up the part on the Waytek website—each part includes future availability and lead time info.

- No Impact = standard lead time still applies

- Minimal Impact = 1-2 weeks of additional lead time over standard

- Moderate Impact = 3-5 weeks of additional lead time over standard

- Major Impact = Unknown, at least double the standard lead time

*Please note that standard lead times are averages of all parts carried for that manufacturer. Lead times for some components are longer than the average listed.

Supplier

Standard Lead Time*

Current Status (Additional Lead Time)

Impacted Product Offerings

3M

8 weeks

Minimal delays (add. 1-2 weeks)

Solderless Terminals

ACT

4 weeks

Minimal delays (add. 1-2 weeks)

Standard Cable Ties

AFC Cable Systems

8 weeks

Minimal delays (add. 1-2 weeks)

Conduit

Amphenol Sine Systems

16 weeks

Minimal delays (add. 1-2 weeks)

A Series Connectors

Anderson Power

6 weeks

Minimal delays (add. 1-2 weeks)

SB Connectors

Aptiv (Formerly Delphi)

18 weeks 

Moderate delays (add. 3-5 weeks)

Multi-Pin Connectors & Terminal Reels

Bayco

6 weeks

No impact

Blue Sea Systems

10 weeks

Minimal delays (add. 1-2 weeks)

Battery Management

CIT Relay & Switch

18 weeks

Minimal delays (add. 1-2 weeks)

Mini ISO Relays

Carling Technologies

12 Weeks

Minimal delays (add. 1-2 weeks)

Rocker Switches

Casco

8 weeks

No impact

Champlain Cable

10 weeks

No impact

Cole Hersee-A Littelfuse Brand

10 weeks

Minimal delays (add. 1-2 weeks)

Switching Devices

DSG Canusa - Shawcor

10 weeks

Moderate delays (add. 3-5 weeks)

Heat Shrink

Data Panel Corp

8 Weeks

No impact

Delfingen

12 Weeks

Minimal delays (add. 1-2 weeks)

Wire Covering

Deutsch

12 Weeks

Minimal delays (add. 1-2 weeks)

Crimpers

Durham Manufacturing

6 Weeks

No impact

Dynatex

6 Weeks

No impact

East Penn Manufacturing

8 Weeks

Minimal delays (add. 1-2 weeks)

Eaton

18 Weeks 

Moderate delays (add. 3-5 weeks)

Circuit Breakers & Power Distribution Modules

Eclipse Tools

4 weeks

No impact

Egis Mobile Electric

4 weeks

No impact

Essentra Plastics

6 weeks

Minimal delays (add. 1-2 weeks)

Clips & Clamps

GEP Power Products

10 Weeks

Minimal delays (add. 1-2 weeks)

Power Distribution Modules

GIGAVAC

14 weeks

Minimal delays (add. 1-2 weeks)

Contactors

General Cable

10 Weeks

Minimal delays (add. 1-2 weeks)

Wire & Cable 

Grote

10 Weeks

Minimal delays (add. 1-2 weeks)

Lights

HELLA

10 weeks

No impact

HMI Systems

8 weeks

No impact

HellermannTyton

10 weeks

Moderate delays (add. 3-5 weeks)

Standard Cable Ties

Heyco

8 weeks

No impact

Ideal Industries

10 Weeks

No impact

Ideal Tridon

10 Weeks

No impact

InPower

8 Weeks

Minimal delays (add. 1-2 weeks)

Contactors

Klein Tools

6 Weeks

No impact

Supplier

Standard Lead Time*

Current Status (Additional Lead Time)

Impacted Product Offerings

Leviton

8 weeks

Minimal delays (add. 1-2 weeks)

Switching Devices

Littelfuse

12 weeks

Minimal delays (add. 1-2 weeks)

Fuse & Fuse Holder

Lovato Electric Inc

8 weeks

Minimal delays (add. 1-2 weeks)

Switching Devices

MTA

10 weeks

No impact

Marinco

12 weeks

No impact

Master Appliance

8 weeks

No impact

Mastervolt

12 weeks

Minimal delays (add. 1-2 weeks)

Battery Management Devices

Maxxima

6 weeks

No impact

Mechanical Products MP

10 weeks

Minimal delays (add. 1-2 weeks)

Circuit Breakers 

Molex

16 weeks

Moderate delays (add. 3-5 weeks)

Solderless Terminals

NOCO Company

8 weeks

No impact

Nason

8 weeks

Minimal delays (add. 1-2 weeks)

Switching Devices

OptiFuse

14 weeks

Minimal delays (add. 1-2 weeks)

Circuit Breakers

Picker Components

12 weeks

Minimal delays (add. 1-2 weeks)

Mini ISO Relays

Pollak

8 weeks

Minimal delays (add. 1-2 weeks)

Switching Devices

Pressmaster

12 weeks

Minimal delays (add. 1-2 weeks)

Crimpers

ProMariner

10 weeks

No impact

Rennsteig Tools

12 weeks

Minimal delays (add. 1-2 weeks)

Crimpers

Rowe Electronics

8 weeks

No impact

Safco

6 weeks

No impact

Sargent Tools Oetiker

8 weeks

Minimal delays (add. 1-2 weeks)

Crimpers

Scapa

6 weeks

No impact

Sealcon

8 weeks

No impact

Song Chuan

26 weeks

Minimal delays (add. 1-2 weeks)

Mini ISO Relays

Southwire

10 weeks

Minimal delays (add. 1-2 weeks)

Wire & Cable 

TE - Raychem

14 weeks

Moderate delays (add. 3-5 weeks)

Wire Covering

TE Connectivity

10 weeks

Moderate delays (add. 3-5 weeks)

Multi-pin Connectors 

Techflex

10 weeks

Minimal delays (add. 1-2 weeks)

Wire Covering

tesa tape

8 weeks

Minimal delays (add. 1-2 weeks)

Tape

Thomas & Betts

8 weeks

No impact

Trombetta

12 weeks

Moderate delays (add. 3-5 weeks)

Contactors

UMPCO Inc.

8 weeks

Minimal delays (add. 1-2 weeks)

Clamps

Unity Manufacturing

6 weeks

No impact

White-Rodgers Emerson

12 weeks

Minimal delays (add. 1-2 weeks)

Contactors

Yazaki

12 weeks

Minimal delays (add. 1-2 weeks)

Multi-pin Connectors

09/26/2022

The continuing shortage of microprocessors and electronic components, as well as other factors outside Waytek’s control, have caused some products to experience longer-than-expected lead times.

As a result, our suppliers’ shipments could fluctuate and larger customer orders could require additional time for fulfillment. We apologize for any inconvenience and are doing everything we can to stock and ship the parts you need.

If you have any questions about your orders, please contact our Customer Service Team. General questions or specific component lead time inquiries should be directed to [email protected] or 800-328-2724. Additional details around specific suppliers can be found below; scroll down to see updated lead times.

Updated Lead Times - See Chart Below

No Impact = standard lead time still applies

Minimal Impact = 1-2 weeks of additional lead time over standard

Moderate Impact = 3-5 weeks of additional lead time over standard

Major Impact = Unknown, at least double the standard lead time

Please note that standard lead times are averages of all parts carried for that manufacturer. Lead times for some components are longer than the average listed.


Supplier

Current Status

Standard Lead Time

Impacted 

Product Offerings

3M

Moderate delays

8-10 weeks

Solderless terminals

AFC Cable Systems

No impact

6-8 weeks

Amphenol

Moderate delays

14-16 weeks

A Series Connectors

Ancor

No impact

6-8 weeks

Anderson Power

Minimal impact

6-8 weeks

SB Connectors

Aptiv (Formerly Delphi)

Moderate impact

20-22 weeks

Mutli-Pin Connectors & Terminal Reels

Bayco

No impact

6-8 weeks

Blue Sea Systems

Minimal delays

10-12 weeks

Battery Management 

Carling Technologies

Moderate delays (add. 3-5 weeks)

12-14 weeks

Rocker Switches

Casco

No impact

8-10 weeks

Champlain Cable

Minimal delays (add. 1-2 weeks)

10-12 weeks

CAN-Bus Cable

Cole Hersee-A Littelfuse Brand

Minimal delays (add. 1-2 weeks)

10-12 weeks

Switches

DSG Canusa-Shawcor

No impact

8-10 weeks

Data Panel Corp

Moderate delays (add. 3-5 weeks)

8-10 weeks

Switching Devices

Delfingen

Minimal delays (add. 1-2 weeks)

10-12 weeks

Nylon Loom 

Durham Manufacturing

No impact

6-8 weeks

Dynatex

No impact

6-8 weeks

E-Switch

No impact

10-12 weeks

Eaton

Moderate delays (add. 3-5 weeks)

8-10 weeks

Circuit Breakers & Power Distribution Modules 

Eclipse Tools

Moderate delays (add. 3-5 weeks)

8-10 weeks

Hand Crimp Tools

General Cable 

Minimal delays (add. 1-2 weeks)

8-10 weeks

Wire & Cable 

GEP Power Products

Minimal delays (add. 1-2 weeks)

8-10 weeks

Power Distribution Modules 

Gigavac

Moderate delays (add. 3-5 weeks)

14-16 weeks

Disconnects & Contactors 

Grote

Minimal delays (add. 1-2 weeks)

8-10 weeks

Lights

HMI Systems

No impact

10-12 weeks

Hella

Minimal delays (add. 1-2 weeks)

10-12 weeks

Mini Relays

Hellermann Tyton

Minimal delays (add. 1-2 weeks)

8-10 weeks

Cable Ties

Heyco

Minimal delays (add. 1-2 weeks)

8-10 weeks

Clamps

Ideal Industries

Minimal delays (add. 1-2 weeks)

8-10 weeks

Clamps

Ideal Tridon

Minimal delays (add. 1-2 weeks)

8-10 weeks

Clamps

InPower

Minimal delays (add. 1-2 weeks)

6-8 weeks

Contactors

Klein Tools

No impact

6-8 weeks

Leviton

No impact

6-8 weeks

Supplier

Current Status

Standard Lead Time

Impacted

Product Offerings

Littelfuse

Minimal delays (add. 1-2 weeks)

12-14 weeks

Fuse & Fuse Holders 

Lovato Electric Inc.

Moderate delays (add. 3-5 weeks)

10-12 weeks

Switches

MTA

Moderate delays (add. 3-5 weeks)

10-12 weeks

Fuse Holders

Marinco

Moderate delays (add. 3-5 weeks)

10-12 weeks

Battery Management 

Master Appliance

Moderate delays (add. 3-5 weeks)

10-12 weeks

Heat Shrink Tools

Maxxima

No impact

6-8 weeks

Mechanical Products MP

Minimal delays (add. 1-2 weeks)

12-14 weeks

Circuit Protection 

Molex

Moderate delays (add. 3-5 weeks)

14-16 weeks

Solderless Terminals

Nason

Moderate delays (add. 3-5 weeks)

10-12 weeks

Switches

Novita

No impact

6-8 weeks

Picker Components

Moderate delays (add. 3-5 weeks)

12-14 weeks

Mini & ISO 280 Relays

Pollak - Standard Motor Products

No impact

8-10 weeks

Switches

Pressmaster

Moderate delays (add. 3-5 weeks)

12-14 weeks

Hand Crimp Tools

ProMariner

Minimal delays (add. 1-2 weeks)

8-10 weeks

Inverters

Rennsteig Tools

No impact

6-8 weeks

Rostra Precision Controls Inc

No impact

6-8 weeks

Rowe Electronics

No impact

6-8 weeks

Safco

No impact

6-8 weeks

Sargent Tools by Oetiker

No impact

6-8 weeks

Scapa

No impact

6-8 weeks

Song Chuan

Moderate delays (add. 3-5 weeks)

30-32 weeks

Mini & ISO 280 Relays

Star Warning Systems

No impact

6-8 weeks

TE Connectivity

Major impact

20-22 weeks

Multi-Pin Connectors

TE-Raychem

Moderate delays (add. 3-5 weeks)

12-14 weeks

Wire Covering 

Techflex

Minimal delays (add. 1-2 weeks)

8-10 weeks

Wire Covering 

Tesa Tape

Minimal delays (add. 1-2 weeks)

8-10 weeks

Tape

Thomas & Betts

Minimal delays (add. 1-2 weeks)

8-10 weeks

Cable Ties

Trombetta

Minimal delays (add. 1-2 weeks)

8-10 weeks

Contactors

Umpco Inc.

No impact

6-8 weeks

Unity Manufacturing

Minimal delays (add. 1-2 weeks)

8-10 weeks

Lights

White-Rogers Emerson

Minimal delays (add. 1-2 weeks)

8-10 weeks

DC Contactors 

Yazaki

Moderate delays (add. 3-5 weeks)

12-14 weeks

Multi-Pin Connectors 

06/27/2022

The continuing shortage of microprocessors and electronic components has created enormous stress on the supply chain for electronic switches and components. Recent factory and port shutdowns in Asia have further interrupted the supply of materials used in these components. These factors outside Waytek’s control have caused some products to experience longer than expected lead times.

As a result, our suppliers’ shipments could fluctuate and larger customer orders could require additional time for fulfillment.

We apologize for any inconvenience this situation may cause and are doing everything we can to stock and ship the parts you need.

If you have any questions about your orders, please contact our Customer Service Team. General questions or specific component lead time inquiries should be directed to [email protected] or 800-328-2724.

Additional details around specific suppliers can be found below; scroll down to see updated lead times.

Updated Lead Times

No Impact = standard lead time still applies

Minimal Impact = 1-2 weeks of additional lead time over standard

Moderate Impact = 3-5 weeks of additional lead time over standard

Major Impact = Unknown, at least double the standard lead time

Please note that standard lead times are averages of all parts carried for that manufacturer. Lead times for some components are longer than the average listed.


Supplier

Current Status

Standard Lead Times

Impacted

Product Offerings

3M

Minimal delays (add. 1-2 weeks)

8-10 weeks

Solderless Terminals

AFC Cable Systems

No impact

6-8 weeks

Amphenol

Moderate delays (add. 3-5 weeks)

22-24 weeks

A Series Connectors

Ancor

No impact

6-8 weeks

Anderson Power Products

No impact

6-8 weeks

Aptiv (formerly Delphi)

Major impact

22-24 weeks

Multi-pin Connectors & Terminal Reels

Bayco

No impact

6-8 weeks

Blue Sea Systems

Moderate delays (add. 3-5 weeks)

14-16 weeks

Battery Management

Carling Technologies

Minimal delays (add. 1-2 weeks)

10-12 weeks

Rocker Switches

Casco

No impact

8-10 weeks

Champlain Cable

Minimal delays (add. 1-2 weeks)

10-12 weeks

CAN-Bus Cable

Cole Hersee - A Littelfuse Brand

Minimal delays (add. 1-2 weeks)

10-12 weeks

Switches

DSG Canusa - Shawcor

Minimal delays (add. 1-2 weeks)

10-12 weeks

Heat Shrink

Data Panel Corp

No impact

6-8 weeks

Delfingen

Minimal delays (add. 1-2 weeks)

10-12 weeks

Nylon Loom

Durham Manufacturing

No impact

6-8 weeks

Dynatex

No impact

6-8 weeks

E-Switch

No impact

10-12 weeks

Eaton

Moderate delays (add. 3-5 weeks)

20-22 weeks

Circuit Breakers & Power Distribution Modules 

Eclipse Tools

No impact

6-8 weeks

GEP Power Products

Minimal delays (add. 1-2 weeks)

8-10 weeks

Power Distribution Modules 

Gigavac

Moderate delays (add. 3-5 weeks)

14-16 weeks

Disconnects & Contactors 

Grote

No impact

6-8 weeks

HMI Systems

No impact

10-12 weeks

Hella

Moderate delays (add. 3-5 weeks)

14-16 weeks

Mini Relays

Hellermann Tyton

Minimal delays (add. 1-2 weeks)

14-16 weeks

Cable Ties

Heyco

No impact

6-8 weeks

Ideal Industries

No impact

6-8 weeks

Ideal Tridon

No impact

6-8 weeks

InPower

Minimal delays (add. 1-2 weeks)

6-8 weeks

Contactors

Klein Tools

No impact

6-8 weeks

Leviton

No impact

6-8 weeks

Supplier

Current Status

Standard Lead Times

Impacted

Product Offerings

Littelfuse

Moderate delays (add. 3-5 weeks)

14-16 weeks

Fuse & Fuse Holders 

Lovato Electric Inc

No impact

6-8 weeks

MTA

Minimal delays (add. 1-2 weeks)

8-10 weeks

Fuse Holders

Marinco

Minimal delays (add. 1-2 weeks)

10-12 weeks

Battery Management 

Master Appliance

No impact

6-8 weeks

Maxxima

No impact

6-8 weeks

Mechanical Products MP

Minimal delays (add. 1-2 weeks)

12-14 weeks

Circuit Protection 

Molex

Moderate delays (add. 3-5 weeks)

18-20 weeks

Solderless Terminals

Nason

No impact

6-8 weeks

Novita

No impact

6-8 weeks

Picker Components

Moderate delays (add. 3-5 weeks)

16-18 weeks

Pollak - Standard Motor Products

Minimal delays (add. 1-2 weeks)

8-10 weeks

Switches 

Pressmaster

No impact

6-8 weeks

ProMariner

Minimal delays (add. 1-2 weeks)

8-10 weeks

Inverters

Rennsteig Tools

No impact

6-8 weeks

Rostra Precision Controls Inc

No impact

6-8 weeks

Rowe Electronics

No impact

6-8 weeks

Safco

No impact

6-8 weeks

Sargent Tools by Oetiker

No impact

6-8 weeks

Scapa

No impact

6-8 weeks

Song Chuan

Major impact

38-40 weeks

Mini & ISO 280 Relays

Star Warning Systems

No impact

6-8 weeks

TE Connectivity

Major Impact

20-22 weeks

Multi-Pin Connectors 

TE - Raychem

Moderate delays (add. 3-5 weeks)

12-14 weeks

Wire Covering 

Techflex

Minimal delays (add. 1-2 weeks)

8-10 weeks

Wire Covering 

Tesa Tape

Minimal delays (add. 1-2 weeks)

8-10 weeks

Tape

Thomas & Betts

Minimal delays (add. 1-2 weeks)

8-10 weeks

Cable Ties

Trombetta

Minimal delays (add. 1-2 weeks)

8-10 weeks

Contactors

Umpco Inc

No impact

6-8 weeks

Unity Manufacturing

No impact

6-8 weeks

White-Rodgers Emerson

Moderate delays (add. 3-5 weeks)

12-14 weeks

DC Contactors 

Yazaki

Moderate delays (add. 3-5 weeks)

12-14 weeks

Multi-Pin Connectors 

03/08/2022

Global supply chain shortages and increased demand on raw materials used in some of the parts we carry have continued in 2022, due to the COVID-19 pandemic and world events.

Currently, our suppliers’ shipments could fluctuate and larger customer orders could require additional time for fulfillment.

We apologize for any inconvenience this situation may cause and are doing everything we can to stock and ship the parts you need.

If you have any questions about your orders, please contact our Customer Service Team. General questions or specific component lead time inquiries should be directed to [email protected] or 800-328-2724.

Additional details around specific suppliers can be found below; scroll down to see updated lead times.

Updated Lead Times

No Impact = standard lead time still applies

Minimal Impact = 1-2 weeks of additional lead time over standard

Moderate Impact = 3-5 weeks of additional lead time over standard

Major Impact = Unknown, at least double the standard lead time

Please note that standard lead times are averages of all parts carried for that manufacturer. Lead times for some components are longer than the average listed.

Supplier

Current Status

Standard Lead Time

Impacted

Product Offerings

3M

Minimal delays (add. 1-2 weeks)

4-5 weeks

Wire Terminals

AFC Cable Systems

No impact

4-6 weeks

Amphenol

Moderate delays (add. 3-5 weeks)

20-24 weeks

AT Series Connectors

Ancor

No impact

4-6 weeks

Anderson Power Products

No impact

4-6 weeks

Aptiv (formerly Delphi)

Major impact

24-26 weeks

Multi-pin Connectors & Terminal Reels

Bayco

No impact

4-6 weeks

Blue Sea Systems

Moderate delays (add. 3-5 weeks)

14-16 weeks

Battery Management 

Carling Technologies

Minimal delays (add. 1-2 weeks)

10-12 weeks

Rocker Switches

Casco

No impact

8-10 weeks

Champlain Cable

Minimal delays (add. 1-2 weeks)

10-12 weeks

CAN-Bus Cable

Cole Hersee - A Littelfuse Brand

Minimal delays (add. 1-2 weeks)

10-12 weeks

Switches

DSG Canusa - Shawcor

Minimal delays (add. 1-2 weeks)

6-7 weeks

Heat Shrink 

Data Panel Corp

No impact

4-6 weeks

Delfingen

Minimal delays (add. 1-2 weeks)

9-10 weeks

Nylon Loom 

Durham Manufacturing

No impact

4-6 weeks

Dynatex

No impact

4-6 weeks

E-Switch

No impact

10-12 weeks

Eaton

Moderate delays (add. 3-5 weeks)

18-22 weeks

Circuit Breakers & Power Distribution Modules 

Eclipse Tools

No impact

4-6 weeks

GEP Power Products

Minimal delays (add. 1-2 weeks)

8-10 weeks

Power Distribution Modules 

Gigavac

Moderate delays (add. 3-5 weeks)

12-14 weeks

Disconnects & Contactors 

Grote

No impact

6-8 weeks

HMI Systems

No impact

10-12 weeks

Hella

Moderate delays (add. 3-5 weeks)

14-16 weeks

Mini Relays

Hellermann Tyton

Minimal delays (add. 1-2 weeks)

8-10 weeks

Cable Tie Mounting

Heyco

No impact

4-6 weeks

Ideal Industries

No impact

4-6 weeks

Ideal Tridon

No impact

4-6 weeks

InPower

Minimal delays (add. 1-2 weeks)

6-8 weeks

Klein Tools

No impact

4-6 weeks

Leviton

No impact

4-6 weeks

Littelfuse

Moderate delays (add. 3-5 weeks)

14-16 weeks

Fuse & Fuse Holders 

Supplier

Current Status

Standard Lead Time

Impacted

Product Offerings

Lovato Electric Inc

No impact

4-6 weeks

MTA

Minimal delays (add. 1-2 weeks)

8-10 weeks

Fuse Holders

Marinco

Minimal delays (add. 1-2 weeks)

8-10 weeks

Battery Management 

Master Appliance

No impact

4-6 weeks

Maxxima

No impact

4-6 weeks

Mechanical Products MP

Minimal delays (add. 1-2 weeks)

14-16 weeks

Circuit Protection 

Molex

Moderate delays (add. 3-5 weeks)

18-20 weeks

Solderless Terminals

Nason

No impact

6-8 weeks

Novita

No impact

4-6 weeks

Picker Components

Moderate delays (add. 3-5 weeks)

15-17 weeks

Mini & ISO 280 Relays

Pollak - Standard Motor Products

Minimal delays (add. 1-2 weeks)

8-10 weeks

Switches 

Pressmaster

No impact

6-8 weeks

ProMariner

Minimal delays (add. 1-2 weeks)

8-10 weeks

Inverters

Rennsteig Tools

No impact

4-6 weeks

Rostra Precision Controls Inc

No impact

4-6 weeks

Rowe Electronics

No impact

4-6 weeks

Safco

No impact

4-6 weeks

Sargent Tools by Oetiker

No impact

4-6 weeks

Scapa

No impact

4-6 weeks

Song Chuan

Major impact

38-42 weeks

Mini & ISO 280 Relays

Star Warning Systems

No impact

6-8 weeks

Switchcraft - Conxall

No impact

6-8 weeks

TE Connectivity

Major impact

10-22 weeks

Multi-Pin Connectors 

TE - Raychem

Moderate delays (add. 3-5 weeks)

12-14 weeks

Wire Covering 

Techflex

Minimal delays (add. 1-2 weeks)

6-8 weeks

Wire Covering 

Tesa Tape

No impact

6-8 weeks

Thomas & Betts

Minimal delays (add. 1-2 weeks)

8-10 weeks

Cable Ties

Trombetta

No impact

8-10 weeks

Umpco Inc

No impact

4-6 weeks

Unity Manufacturing

No impact

4-6 weeks

White - Rodgers Emerson

Moderate delays (add. 3-5 weeks)

12-14 weeks

DC Contactors 

Yazaki

Moderate delays (add. 3-5 weeks)

12-14 weeks

Multi-Pin Connectors